-
Posts
2,936 -
Joined
-
Last visited
-
Days Won
145
Content Type
Profiles
Forums
Resource Library
Events
Gallery
Blogs
Store
Community Map
Everything posted by ttc0169
-
-
Me too….
-
Thanks Jason
-
The race is on…… 036 eases ahead of pioneer 001 as 036 works the Sligo-Northwall BELL liner and 001 working the Shelton abbey-Sligo laden Fertliser train.
-
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
We have approximately 10-12 members in Cork that drive up to Maam cross whenever there is a work day announced. 236 KLM’s is the distance but it’s no obstacle to the members that do it on a regular basis-and they return the same evening-that’s dedication -
When 152+132 were due an exam at the MPD the opportunity was taken to replace them at Tara junction station, When they arrived working the BELL liner it was discovered by locomotive fleet control that the only available option was 071 class locomotive 087, The locomotive was duly dispatched and replaced both small GMs-here we see 087 working the Northwall-North esk BELL liner through the station.
-
-
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
The first visit of 2023 to the Maam Cross Connemara Railway Project took place earlier today when a hardy bunch of volunteers braved the weather to get back to work in preparation for what is promised to be an exciting year ahead, Work included the building of work benches and storage areas in the main shed, Preparation of the up Galway platform ahead of resurfacing later in the year, Signal cabin internal lighting and CCTV fitted, My pet project is the refurbishment of ballast plough van 24853, I began today clearing out the debris inside which was associated with the internal fire that took place a few years ago while stored in North wall ,thankfully after advice from some woodwork specialists who were on site,they advise that the damage is not as bad as was thought so internal and external refurbishment will get underway early this year Apologies for the late reply, Yes two coaches will be arriving at the site over the next couple of weeks-with a possible unique vehicle at a later date. There are plans to rebuild the station building-but that’s more of a long term goal. Thanks- 417 replies
-
- 15
-
-
-
-
Drama on the high street junction when smoke was seen coming from the rear of SE 31-emergency services were quickly on the scene and extinguished what could have been a serious fire….
-
-
- 30 replies
-
- 16
-
-
-
-
Many happy returns and thanks Bob
-
To all my railway modeller friends i wish you all a very happy Christmas and a peaceful new year from the management and staff at Tara junction.
-
I wonder how many of us got a train set for Christmas!..........
ttc0169 replied to LARNE CABIN's topic in General Chat
The CIE Slainte express was one of the first trains sets-still have the Hymek and coaches-followed by the Hornby R686 intercity class 37 set-then in 1981 was the HST train pack and in 1986 came the Lima HST -
Hi George,thank you, the P&T van was a once off commission, I purchased it from Ray at Diecast models for you in Galway. I’ll even do an overnight for you DJ
-
Thanks Patrick
-
Brookhall Mill - A GNR(I) Micro Layout
ttc0169 replied to Patrick Davey's topic in Irish Model Layouts
Looking well Patrick -
Gearing up for the busy Christmas season we see preparations being made to increase train sizes….the first set to be increased was the Cravens-9 Cravens and 2 BR GSVs, Locomotives 124+134 assist with the shunting as 018 has a single GSV 3189 to add to the rake of Cravens Also a number of mail trains are scheduled to operate-the first of these is seen here arriving at platform one behind locomotives 160+192 in what is a mixed livery formation from the late 1980s era. The local P&T van awaiting the mail bags.
-
An enjoyable weekend was had catching up on projects at the junction too…
-
-1….
-
Thanks George
-