-
Posts
2,993 -
Joined
-
Last visited
-
Days Won
148
Content Type
Profiles
Forums
Resource Library
Events
Gallery
Blogs
Store
Community Map
Everything posted by ttc0169
-
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
Don’t understand DJ?? -
Four hours of fun condensed into five minutes.. Passenger,mail and freight operation on Tara junction. Enterprise locomotive 230 hauling a Mk2 a/b set working a Galway-Dublin Heuston service NIR locomotive 208 works a Northwall-Belfast BELL liner, 080 works a Waterford-Northwall BELL liner 056 works the Cork-Dublin Connolly mail train, 086 works a Tralee-Dublin Heuston service. — at Tara Junction Station Passenger,mail and freight operation on Tara junction.
-
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
Six more track panels were laid yesterday by volunteers extending the line further towards the Oughterard/Galway direction.- 431 replies
-
- 17
-
-
-
You are at the black stuff again Jonathan…..
-
I play with the real trains…I don’t see that one there…
-
47535 works a short Mk3 push pull set comprising of two Mk3s and a Mk2 DBSO from Edinburgh Haymarket depot to Doncaster works for attention.
-
Confined to the Lakeview freight yard shunting pilot is locomotive 133-seen here placing MX Guinness wagons for unloading…
-
A daytime path was created for the APT test running….now sporting a CIE roundel on the front and rear driving trailers.
-
The year is 1986 and CIE have been given an APT by British rail for evaluation purposes… Having being regauged at Crewe works it was shipped over to Inchicore for trials to begin on Tara junction Here we see locomotive 087 hauling set 370 001 on a gauge clearance movement prior to the nighttime trials to begin…
-
-
The recently successful and enjoyable RPSI rail tour-the Liffey / Leesider is recreated here as we see locomotive 083 hauling the empty Cravens set from Inchicore to Connolly.
-
A useful addition-well done lads.
-
- 11 replies
-
- 11
-
-
-
-
A gentleman, may Fred rest in peace.
-
2x20s work the laden MGR train through Ashburton grove from the Shirebrook pit to Drax power station.
-
An early Tuesday morning under the floodlights at Tara junction MPD sees various locomotives being prepared for service.
-
Monday morning and 056 has charge of the Galway-Dublin Connolly mail train,seen here arriving at Tara junction.
-
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
Some track laying work was completed today at Maam cross, Four track panels were installed at the Galway end approximately 1/2 mile from Maam cross station. Ballasting work was also completed as it’s a shared roadway Work was completed on the painting of the loading bank crane- 431 replies
-
- 19
-
-
-
The year is 1989 and the trains on Tara junction are operating to the working timetable of that year…. Here we see K602 the 14:50 Marino point-Shelton abbey laden ammonia train hauled by 056 stop at Tara junction for a crew change, About an hour later the late running 17:30 Shelton abbey-Cork laden fertiliser train T201 hauled by 007 arrives at Tara junction.
-
Superb modelling,well done Rob
-
Room lighting was switched off-only using the layout lights for a change.
-
-
Thanks DJ- I also used a gauge master track rubber for the east to reach areas of the layout.
-
A nighttime permanent way possession of Tara junction has now been implemented in order to facilitate the operation of the track cleaning coach around the hard to reach areas of the layout. The crew of locomotive 201 prepare to start the cleaning process which forms an essential part of any model railway operations.
-
The factory siding pilot 08 is busy as it shunts some vans into position for the 37 to work onwards as the oil tank/cement train has arrived on the loop.