-
Posts
2,936 -
Joined
-
Last visited
-
Days Won
145
Content Type
Profiles
Forums
Resource Library
Events
Gallery
Blogs
Store
Community Map
Everything posted by ttc0169
-
Duly ordered-Locomotive A1 has been stored in the works for far too long awaiting an ''engine'' Looking forward to the trials later in the week. Well done IRM
-
Thanks all, It must be the NIR 450 class that’s parked on the platform.
-
Saturday morning action on Tara junction. 084 blasts through the station hauling the 07:30 Tralee-Heuston Mk3 set 056 passes hauling the 07:05 Limerick-Heuston-Cravens set 048 passes through hauling a Platin-Athenry two axle laden cement 054 has charge of a 09:05 Heuston-Galway Gaeltacht special -Cravens set 2601+2602 pass working an Athlone-Heuston service. 027 has charge of the Sligo-Northwall empty oil train  126+132 work a Waterford-Northwall bogie BELL liner. — at Tara Junction Station
-
It sure is DJ
-
cie The Road freight section at Tara junction
ttc0169 replied to ttc0169's topic in Trucks, Vans and cars
-
A consignment of fertiliser has been off loaded from the liner train onto the AEC artic at the Lakeview freight yard, and is enroute to a customer.
-
-
Thanks Popeye-it’s a kit from the Kibri range,and yes the jib extends and lifts up.
-
-
A new arrival to the school bus fleet SF2 has arrived at the depot and is seen here getting serviced.
-
The evening sun has set on Tara junction as the Park Royal branch set has arrived at its destination.
-
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
South west of Ireland-not a railway original. -
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
Recent progress at Maam cross was the external painting and internal cleaning out of the water tank…preparations are being made for this to be lifted into position over the coming weeks. The site also received a lovely mention in the June issue of Trains magazine,Americas best selling railway magazine.- 417 replies
-
- 10
-
-
It’s electrifying stuff alright…
-
And one of the favourites on the layout
-
Abbey Jnct Signal Box being removed.
ttc0169 replied to Wexford70's topic in What's happening on the network?
Zero… -
-
There you go DJ….9 mins of action…
-
-
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
Yet more progress at Maam cross on which was a fantastic summers day there, Work included the completion of the surfacing and fencing on the up Galway platform, Completion of the interior of the signal cabin-work continues underneath on the interlocking Painting of the steel work on ballast plough van 24853 prior to the fitting of the interior wooden panelling Deep cleaning of coaches 2421,1916 and Mk3 sleeper 10598, And finally installation of point rodding and signal wire pulleys along the up Galway platform An enjoyable day out Here are photos from the day.- 417 replies
-
- 23
-
-
-
-
Celebrating the 50th anniversary of the introduction of the Supertrain to service on Irish railways back in 1973, Pioneer locomotive 001 is seen here working the 17:30 Cork-Dublin Heuston through Tara junction as B188+B125 work a laden fertiliser train
-
Tagged onto the back of the TPO set is MK3 Sleeper 10598 hauled by 31131 as 58003 passes with an MGR working. IMG_1378.mov
-
Green Dublin Buses for over 50% off?! Britbus Local Links Now In Stock!
ttc0169 replied to Warbonnet's topic in Bus models
A scratchbuilt model of an E class bus-Jim Poots did resin kits about ten years ago of the type,but this isn’t one of them, A good find Dave. -
31131 hauls two TPOs out of the up siding into the factory sidings prior to working them to Manchester.
-