Jump to content

ttc0169

Members
  • Posts

    2,939
  • Joined

  • Last visited

  • Days Won

    145

Everything posted by ttc0169

  1. Thanks lads-so far so good, In this scene we see NIR 8113 stabled at the loop platform with the RPSI Mk2 set which has arrived from Whitehead, 0117080 is working on the bi-directional line with the HOBS train.
  2. Refurbished loco 0117080 nearly ready for the road.
  3. Late night Possession on Tara Jctn sees 017080 depart from the ballast loading siding with the HOBS train, 086 has charge of the super train liveried Mk3s which include an extra Mk3 EGV which is en route to Westport to replace a failed EGV.
  4. 228-New Enterprise livery
  5. Nice work Tom.
  6. Good morning gentlemen, After successful trials I have been able to operate four trains at the one time around the layout including shunting in the yard, Here is a photo of 086 arriving with the Supertrain Mk3 set at platform 4 with loco 087 passing though light engine heading for the MPD, Platforms 2 and 3 are occupied with 234 pushing the Mk4 set and 8208 working the De-Dietrich Enterprise set. Loco 201 and 0117071 are stabled on the turntable road.
  7. Evening gentlemen, Another bit of progress done over the last few days....I've added some scenery-(not my strongest point)-but I'm happy with the results The per way sidings are starting to fill up with the weed-spray train and HOBS train now stabled there, Over on platform 6 the 29000 awaits the connection from 208 and the NIR Mk2s which have arrived on platform 5.
  8. A very nice selection of colour light signals there Raymond-and will look great on your spectacular layout, watching with interest.
  9. Morning Kieran-TL= Train Line-equipped with a cable for lighting throughout the train.
  10. Nice work so far-love your port area....reminds me of North Esk.
  11. Good evening gentlemen,thank you all very much for your kind replies,it is much appreciated.... Work is progressing well on the layout-the up and down fast lines have been handed back to passenger services,and attention has now turned to the relief lines... Here we see sound fitted loco 0117077 arrive with the HOBS train on the loop platform-with 0117071 waiting to couple to the weedspray train on platform 4, The tamper and Sperry wagon are stabled on one of the new perway sidings
  12. Excellent video Anthony....it's what railway modelling is all about....recreating the real thing in miniature and getting enjoyment out of it...you have certainly done that-well done.
  13. Photo taken from the station footbridge sees 0117071 move slowly towards the limit of the possession-(the red light in the distance) in order to discharge ballast from the rearmost wagons.
  14. A late night possession of the station area sees ballasting and tamping taking place, 0117071 has charge of the HOBS train which is about to discharge along platform one, On platform two tamper 751 has started working under the watchful eye of Tommy the engineer in charge of the operation.
  15. "Wonderful weathering" not overdone either with dirt in all the right places... A lovely setting too Eamonn.
  16. Still a bit of work to be done on the loco-but it's looking great at this stage of its overhaul.
  17. Slowly getting there-painting track and baseboard a shade of brown... The HOBS train and tamper are next up for some intensive ballasting work.... Embankment work in progress as well.
×
×
  • Create New...

Important Information

Terms of Use