Carrick On Suir in the 1990's to mid 2000's would make a smashing setting for a layout. Not a big station or platform lengths. A nice little signal box on the platform, the ITG building. The level crossing and signals are available from SSM. Plenty of rolling stock and consists that don't have to be huge. Cement (bagged and bulk) Beet, Timber, Guiness liners, all these would be passing through. Passenger trains of 2 Craven's GSV and a 141-181. The same could be said of Park Royal and Dutch van. As much as it hurts me to say it 2700 Railcars. You could have the odd Knock special or GAA special. Not big consists or large space needed and it is not to long ago.
Rich,