-
Posts
4,714 -
Joined
-
Last visited
-
Days Won
113
Content Type
Profiles
Forums
Resource Library
Events
Gallery
Blogs
Store
Community Map
Everything posted by Mayner
-
Kilmacthomas would make an excellent scenic and operational layout, with the river, town and the railway structures against the backdrop of the Comeragh Mountains. Goods traffic appears to have been quite heavy with a small goods yard at the station and the Fair Green siding which connected to the main line on a ridge between the two viaducts. Flavahan's appear to have been the biggest shipper their porridge by rail! The signal box, crossing loop and a short siding was retained at Kilmacthomas when the line was re-opened for Quigley Magnesite traffic in the early 70s until final closure in 82? The Dolomite trains from Bennetts Bridge to Ballinacourthy were the heaviest in Ireland up to the start of Tara Mines traffic in the late 70s, two trains daily in each direction 20 wagon rakes of 4w hopper wagons (same as IRM model) worked by pairs of B141/181 diesels. The daily Tivoli-Ballinacourthy Magnesite & oil train was regularly hauled by a single 001 Class hauling a mixed rake of covered magnesite hoppers and tank wagons. In steam days Woolwich Moguls worked the trice-weekly Cork-Rosslare Express with a small wheeled Coey 333 Class 4-4-0 working the Daily Cork-Waterford Passenger & the 101 or J15 Class the goods. B101 Class took over passenger & possibly goods workings until replaced by B121 & B141 Class and A Class before the 1967 closure of the line.
-
Feast or Famine - Passenger Stock for A's and 121's
Mayner replied to DJ Dangerous's topic in Irish Models
There is always the option of following the late David Jenkinson's example in "Carriage Modelling made easy" and scratchbuilding the models that are not produced as rtr models or kits. David Holman's MGWR brake and convertible wagons are excellent examples, using simple techniques. -
I love the BW Beetle presumably delivering milk to the creamery, the Mercedes and green sports car evidence of 1960s rural prosperity. My mother and father were invited to a wedding in Ballinasloe around the same time and were totally taken aback by the signs of my fathers farming cousins prosperity, flash cars, high fashion and extravagant hospitality.
-
Re-building is covered in the August blog, https://cpineroad.blogspot.com/2020/08/00-works-class-330.html. The builder ended up replacing the chassis, motor and gears to improve the standard of low speed running! It looks like a decoder would have to be hard wired just might fit in the tank
-
Link to a review of the Southern Railway version of the model and the potential challenges in fitting a decoder. https://cpineroad.blogspot.com/2020/07/00-works-class-0330-0-6-0-saddleback.html The buyer re-built the loco with a two stage High level gearbox and Mashima motor because he was not satisfied with the slow running characteristics on the loco
-
Cattle traffic ceased in 1975, the heaviest traffic used to be from the seasonal cattle fairs from cattle breeding country in the West and Southwest to farms in the East for fattening (finishing) and for export. Most of the cattle traffic was lost with the shift from seasonal cattle fairs to cattle marts and the shift from live exports to meat processing during the 1960s. In later years cattle was transported by rail to meat factories plants at Roscrea and Grand Canal Street Dublin were served directly by rail, the Leixlip Plant was served by road from Hazlehatch on the Cork Line and Leixlip on the Galway Line. Leixlip and Hazelhatch were among the last stations to handle livestock traffic.
-
Thursday Walkabout on the Main Trunk Line
Mayner replied to Mayner's topic in Photos & Videos of the Prototype
Eight months later another day on Walkabout in King Country that did not exactly go to plan. The basic idea was to cycle the remains of the Ongarue Tramway and famous Spiral https://www.doc.govt.nz/parks-and-recreation/places-to-go/waikato/places/pureora-forest-park/ongarue-tramway-and-spiral/ but my knees were no longer up to it and I had to turn back after 3km. Still it was a beautiful sunny day a good escape from the cabin fever of the last 5-6 months. Signals were clear for a Southbound train at Te Kuiti so I decided to follow the railway line than the more direct SH3 & 4 Route to Ongarue. The Southbound freight was not far off, the Northern Explorer passenger train as overseas tourists are 3extremely scarce with the drop off in international air travel. After the almost level 200Km run from Auckland a pair of 3,600Hp Chinese built DL locos at the beginning of the approx 32km 1:70 climb from Te Kuiti to the summit at Poro-O-Tarao tunnel. The railway line on the left is the remains of the 2km Te Kuiti Industrial line which served local industries including a limeworks and a bulk fertiliser depot. Further up the valley the railway runs alongside SH30 before entering a narrow gorge where the railway climbs to a higher level. I was using an Android phone and had hoped to capture the train passing a distinctive round roof barn, a distinctive structure on this section of the line but could not see the screen in strong sunlight! Once clear of the gorge the line runs along a ledge between the valley floor and surrounding hill country. Train is about to pass through a shallow cutting as it approaches the Kopaki Passing place before passing into another gorge before entering a wider section of the valley. View of snow clad Mt Ruapehu from the watershed between the Waikato and Waunganui river systems, leaving the Poro-O-Tarao tunnel the railway runs through the Ongarue River Valley on the extreme right of the photo. The Ongarue system which lasted into the 1960s used American Climax, locally built AJ Price geared logging locos. https://teara.govt.nz/en/photograph/12244/wooden-trestle-viaduct Typical central North Island bush and the three active volcanoes from right Ruapehu, Ngauruhoe and Tongariro. A former workmate found this particular viewpoint while working in the area in 2017 and it sounded like it was worth checking out. Most of the bush (forest) is second or possibly 3rd generation re-growth after the land was cleared for agriculture about 100 years ago. -
Feast or Famine - Passenger Stock for A's and 121's
Mayner replied to DJ Dangerous's topic in Irish Models
Even long distance Intercity services from Heuston to Tralee & Westport made up of conventional stock could include quite a mix of coaching stock until replaced by MK3 & MK2D rolling stock in the mid 1980s. A typical Heuston-Tralee or Westport service would included a mixture of Craven, Park Royal and Laminate stock, a Buffet Car and BR van regularly loading up to 8-10 coaches regular formations on the Connolly Sligo & Rosslare services tended to shorter 5-6 coaches including Buffet & Van. Formations were strengthened off with older stock borrowed from Dublin Suburban services at weekends and for peak Summer and Christmas/New Year traffic. CIE had a habit of reducing train frequency, running longer trains and sometimes combining trains for different destinations during periodic economy drives. Midland Section trains sometimes loaded to 12-14 coaches on a number of occasions when Dublin-Galway-Westport-Sligo services were combined into a single train with Dublin-Galway trains detaching through coaches for Sligo at Mullingar and Westport at Athlone combined trains last operated for a short period during the 1970s oil crisis. Knock specials regularly loaded to 12-14 coaches of conventional stock into the mid 1980s. -
The saga of CIE Brake Standard coaches is a bit complicated. CIE built 10 Brake Standards of two different designs in 1950s and converted a further 23 Standard and Composite coaches to Brake Standards and Brake 1st in the early 1970s. A Laminate Brake Standard from the 1909-1913 series dating from the late 1950s was fitted with storage heaters for use with the G611 Class locos on the Branch in 1963. The "Loughrea Coach" (I don't recall the number) entered service on the branch in the light green livery. Jonathan Allens 1971 photo of B163 with a Laminate Brake at Loughrea. https://www.flickr.com/photos/152343870@N07/26240340648/in/album-72157714061635252/ The Laminate appears to have been replaced at some stage by 1904 a 1904-1908 series Brake Standard dating from 1953. https://www.flickr.com/photos/152343870@N07/40357066271/in/album-72157714061077963/ Locomotives & Rolling Stock of CIE & NIR (1979) notes that 1904 is fitted with storage heaters and in use on the Ballina Branch. The 1970s Brake Standards & Brake 1st were converted from Laminate Suburban coaches (one survives in use with the RPSI) and 1951-1953 stock and differ significantly in appearance. Silver Fox produce a rtr model for the 1953 Brake Standard http://silverfoxmodels.co.uk/ir-ie-open-brake-3rd-coach/ (some lost their guards look outs), I produced a set of side overlays complete with lookouts to fit a Dapol Stanier Coach & Worsley Works produce a set of brass parts (sides, ends underframe) as a scratchbuilders aid to build a 1909-1913 Laminate Brake The Dapol overlays are a compromise in terms of length, width and end profile, but less of an undertaking than scratchbuilding or building a coach with the assistance of the Worsley Works parts.
-
Feast or Famine - Passenger Stock for A's and 121's
Mayner replied to DJ Dangerous's topic in Irish Models
There is always the Silver Fox 1951-53 stock they appear to pass the 2' rule until someone produces a more accurate rtr model or a kit. The Buffet Cars were used on Intercity Trains with conventional stock until the introduction of the Craven Snack Cars in the late 1980s, the Corridor and Open Standards and Brake Standards were mainly used on suburban, secondary main line and branch line services after the introduction of the MK2D stock and were phased out during the early 1980s. The main problem from a rtr manufacturers point of view is that there is no CIE equivalent of the British Rail MK1 coach with 3-4 body variations that will sell in large numbers. The Laminates built in the late 1950s are the nearest thing to a standard design of main line and suburban coach built in large numbers in at least 5 basic body variations, but no matching catering vehicles. There is also the little matter of the absence of suitable rtr heating vans to run with conventional stock apart from the Silver Fox offerings. There is always the option of assembling a kit or scratchbuilding stock to fill the gaps in the market. -
I tend to be drawn to layouts that feature realistic operation particularly in the larger scales than highly detailed scenic masterpieces like Barry Norman's or Iain Rice' layouts though until recent years I mainly modelled in N & 4mm scale. My first lightbulb moment was watching the late Harry Connaughton shunting hand built GNR(I) O Gauge locos and stock with 3 link couplers at a model railway exhibition in a Dublin scouts hall in 1973-4. The quality of the models and smoothness of running was far beyond the relatively crude OO gauge rrtr models available at the time. Another lightbulb moment was watching the Milton Keynes Model Railway Society O gauge Maybank style layout in operation at an exhibition at Welwyn Garden City in the late 1980s with loco hauled passenger trains arriving at and departing from a compact city terminal with light engine and empty stock movements between the terminus, loco shed and carriage siding like a smaller version of Euston. Stock was a mixture of hand built, kit and some vintage tinplate locos (which did not run very well!) I was disappointed that the club had disposed of the O Gauge end to end layout when I joined several years later, but enjoyed occasionally assisting Chris Lyster with tracklaying on the clubs EM gauge Milton Quays Southern Region layout. I thoroughly enjoyed watching the realistic operation of a very simple N Scale blue diesel era Western Region layout at an exhibition in Surrey or Berkshire, the layout was simplicity itself a small station on a double tracked main line with a running loop to recess freights and slow moving passenger trains clear of the main line fed by a battery of storage sidings, it was one of those layouts where a gricer could sit and take numbers as trains passed by though motive power was mainly restricted to Trix Warships & BRCW Type 2 diesels hauling Minitrix and Peco rolling stock as apart from Minitrix & Peco there were very few decent reliable rtr British outline locos and stock available at the time. More recently I have been taken by the physical presence and realism modelling of New Zealands 3'6" gauge railways in 9mm Scale particularly the big travelling exhibition layouts and Neil Andrew's "Cape to Kairo" layout with its floor to ceiling modelling of the Central North Island Bush (rain forest) with highly realistic modelling of the unique local tree species.
-
An un-credited photo of 12L under repair in Ballinamore Works in 1956 from the Pan Paperback edition of P J Flannigans book. It looks like the loco was recently repainted and is being re-assembled following repair, the colour is anyone guess. Ballinamore had lost most of its machine shop facilities when overhauls were concentrated at Inchacore in the 1930s, 12L last visited Inchacore in 1947 so it looks like Ballinamore retained capability to carry out all but major overhauls. There are some excellent colour photos of C&L locos in their final years of operation in Midland Publishing "Irish Railways in Colour" series, the most noticeable thing is that the locos were kept very clean despite burnt chimneys and smokebox doors and badly worn paintwork. Goods stock appeared to be well maintained and in good external condition in order to handle the relatively healthy goods traffic, passenger stock was a different story with one or two reasonable coaches on the Dromad-Belturbet main line and a a couple of decrepit former C&L coaches retained for the daily Arigna mixed train. The model looks fantastic, I am tempted to build a Passage Tank but its likely to stick on the curves on my layout just like 13L did with a coal special on the Tramway in 1934, nothing like prototypical accuracy even on a fictious extension of the Tramway to Boyle or Sligo
-
The Kitmaster/Airfix cattle wagon and oil tank wagons were one of my staples for Irish wagons when I was started modelling. I used to do odd sorts of things with the tank wagons shortening the tanks and mounting them on Trix wagon chassis and converting the chassis to carry Triang-Hornby 20' containers by chopping the chassis in two, shortening the length and re-joining. More recently I re-built Dapol tank wagons to resemble the ESSO Sligo oil train wagons by extending the tank barrel at each end with sections cut from a spare barrel, the joints are barely noticable once sanded down with wet and dray paper. The Dapol versions come with the added bonus of decent wheels and tension, the kits are a relatively cheap and quick way of churning out rakes of wagons, until fairly recently the Dapol kit was the best option for modelling the British Railways 16t mineral wagon, I still have a rake of about 20 Airfix/Dapol mineral wagons somewhere.
-
Railway workers often develop a gallows humor to keep their sanity like police or emergency services. One of the more gory jobs is removing human remains from under a train, a mate of mine was a maintenance manager at a South London Depot one of the tricks played on new recruits was to plaster the underside of a unit with sausages or mince meat and wait to see the reaction.
-
It varies some modelers turn their own either with a lathe or using a drill and file, Ultrascale will supply high quality 21mm wheel sets to order with a 9-12 month lead time, 28mm axles may be available through the Scalefour Society, North Yard in New Zealand produce a 28mmX 2.03 pinpoint coated brass axle for Sn3.5. There is also the alternative of cutting and extending a standard 26mm axle using 2mm bore brass tube as a sleeve.
-
New Zealand has a Government run an insurance based accident compensation (ACC) system which precludes claims for personal injuries, the no-blame state system basically covers medical and rehabilitation costs and up to 80% of loss of income. Courts also award reparations to victims in health and safety prosecutions. The system is intended to help people recover and get back to work/move on with their lives more quickly than by pursuing a claim through the court system. The downside is the system reduces the incentive for businesses to pro-actively manage health and safety risks in the absence of higher insurance premiums arising from personal injury claims, the no fault system with its industry based rather than individual levies or premiums. The legal requirement to securely fence railways in the UK and Ireland goes back to the dawn of the railway age while the rest of the World took a more pragmatic approach you enter the rail corridor at your own risk, the UK adapted a risk based approach to occupational health and safety following the publication of the Robbins Report in the late 1960s this approach was later adapted by Ireland and a number of Commonwealth Countries. What ever people think of "elf and safety" the UK consistently has one of the lowest occupational death and injury rates in the developed World with Ireland and most EU countries trailing behind.
-
The Chatham Show brings back memories, I had recently moved to the UK and for the 1st couple of years spent most weekends visiting exhibitions and preserved railways in the South and East Midlands. Taking the train from Victoria to Chatham in an early Southern Region EMU (4EPB?) was quite an adventure compared to the more modern stock used North of The Thames. At one stage I was a member of the Milton Keynes Model Railway club who kindly stored my layouts in Bletchley Park as I went gallivanting around Scotland and Ireland until Denis Lovett (MKMRS Treasurer) asked Kevin Thornbury (MRSI President) to remind me to collect my layouts while Kevin was visiting Bletchley Park. I eventually collected and almost completed one of the layouts (EM min space mineral railway), it appeared at a number of Irish Exhibitions about 20 years ago and was exhibited at Warley in 2004/5 connected to Frank Davis's Western Region layout though I was 12,000 miles away at the time. I got involved in the exhibition scene following my return to Ireland in the Mid 1990s acting as Roadie for the late Frank Davis helping to set up an operate his EM gauge Wentworth layout at exhibitions throughout Ireland, the Bangor Model Railway Club was notable for its hospitality to exhibitors with its excellent Saturday Night dinners. New Zealand tends to follow American influence with a greater focus on conventions rather than exhibitions with convention delegates visiting layouts on layout tours, though there is an exhibition circuit based on a small number of regional shows. My garden railway was included in layout tours at two conventions and my 3' gauge Irish layout Keadue was included at the last minute in the 2014 National Convention. Heavy rail was forecast during the weekend of the convention with Sunday a wash out, we quickly moved the layout from the house to the workshop where it provided a useful diversion for visitors sheltering from the rain. The Association of American Modelers of Australasia (AMRA) is considering a mini-convention in Hamilton in October but all bets are off in the current uncertain situation, though Keadue has had a dust off just in case the weather turns bad.
-
I had a pleasant surprise this afternoon with the arrival of a weed spray pack just over a week since I placed the order, international mail service between the UK and Australasia seems to be getting back to normal.
-
CIE initially attempted to operate "a no-shunt railway" with fixed formation trains when freight services were modernised under Railplan 80, with scheduled Liner Trains for container traffic and fixed formation trains for specific traffic flows, train length was effectively limited to 15 (42') bogie or 204 wheel wagon with the available motive power. Following it establishment IE adapted a more pragmatic approach with less of a focus on running point to point fixed formation trains and an increased level of shunting. Train lengths increased to 18 (42') or 35? wheel wagons following the introduction of the 201s and following union agreement to operate the 071s on freight traffic During the 1970s and 80s the Limerick Cement factory was served by a three times weekly block train direct from Kingscourt, in later years (c2000) the gypsum wagons were usually attached to the rear of a Platin-Cork bulk cement train and detached at the Junction, the wagons would have been worked to and from the factory by a trip working from Limerick. Its possible that the Limerick gypsum wagons were attached to scheduled liner trains between Drogheda and Limerick if the Platin-Cork was not operating. The 12:00 North Wall-North Esk Liner conveyed keg and container traffic to Limerick Junction in the late 1990s, the Limerick wagons were usually marshalled immediately behind the locomotive to speed up the shunt.
-
Politically the ILDA dispute occurred at a very convenient time when the future of the railways was under review and CIE was instructed by the Minister of Transport to dispose of surplus land (freight yards?) to fund investment in public transport. Steel traffic from Haulbowline would have been loaded onto scheduled Liner trains at North Esk, there was never enough traffic to warrant a dedicated steel liner. Limerick Ennis was not affected by the temporary closure of the Ennis-Claremorris section a daily Heuston-Ennis & return passenger operated during the 1990s, Ennis-Athenry re-opened with a Limerick-Gort bagged cement special, bulk cement to Athenry was a regular traffic on this section before regular operation ceased around 2002-3. I seem to have forgotten the trice weekly Kingscourt-Castle Munget Gypsum Train! In later years the Gypsum was attached to the rear of the Platin-Cork Bulk Cement train detached at the Junction and worked to Limerick on a local trip working.
-
Steel traffic was mainly shipments of reinforcing rod from the Irish Steel Haulbowline plant to Dublin carried on scheduled Liner trains, traffic was not particularly heavy as CIE only had 8 bogie flats suitable suitable for carrying the traffic. Molasses for Mullingar and Longford was attached to Limerick-Dublin and Dublin-Sligo Liner trains The Ennis-Claremorris line was only in intermittent service during the 1990s and the Mullingar-Athlone Line closed to regular traffic. Apart from a short lived Limerick Claremorris Liner (95-96) Traffic north of Ennis was largely restricted to the Ashai Coal and Oil train, fertiliser and cement specials. The line was closed to regular traffic for approx 2 years (94-95?) and the coal and oil train diverted to run via Roscrea and Portarlington when track from the line was salvaged for use on the Ballina Branch and other lines which were in poor condition. Despite the new liveries and new traffic flows the Irish railway system was effectively being run into the ground during the early 90s with de-railments, train breakdowns and speed restrictions as a result of minimal infrastructure investment and deferred track maintenance on the majority of main line and secondary routes.
-
The Hornby, Lima and possibly Mainline BSK coaches were basically stretched versions of the BR 57' Full Brake to fit a standard BR MK1 63 or was it 64' coach chassis. The Hornby, Lima and Mainline BR Full Brakes are a reasonable starting point for a modeler planning to scratchbuild new sides or use Bill Bedford (Mousa Models) etched overlays. A Bachmann Brake Composite (BCK) or Brake 2nd (BSK) would be a better option for a modeler who intends to build a BR Van or the Weedspray coach by modifying a rtr model. Personally I am tempted to build a van using a combination of Comet parts and Mousa Models sides.
-
The signalling of manned level crossings was largely dependent on local conditions in particular whether the driver of a train could see a signal or gate in time to safely stop short of the crossing! On passenger running lines crossings were normally protected by a working distant signal, the crossing barrier or gate was normally classed as a home or stop signal although separate home signals were usually provided where there was poor sighting as a result of a curving approach or a crest between the distant signal and crossing gates. In some cases signals were operated without a lever frame by physically opening or closing the crossing gate, a lever frame interlocked with the gates was usually required on crossings with working home and distant signals such as those between Liffey Junction and Maynooth on the Midland main line Crossing signals were normally fixed at danger at un-manned crossings on goods only or lines with no regular passenger service like Drogheda-Kingscourt. A lot of crossing signals were based on steam stopping distances and had to be moved out with increasing train weight and freer running rolling stock, there was an incident in recent years where a Liner ran through a set of gates on the Mayo Line despite the driver applying the brakes as he passed a distant signal at danger. Signals where the arm slotted vertically within the post to display a clear aspect were phased out following the Abbots Ripton disaster where a signal arm in the 19th Century, but continued in use in the North East of England into the British Railways Era, the SLNCR no doubt continued with it antique signalling because it worked and did not have the money or see the need to modernise.
-
The IRM 42' flats are models of the 42'9" wagons, the overall length of the bogie and some CIE flat wagons was longer than the bed or load length in order to carry 8'6" or 9' containers within the loading gauge. 27301-27767 22'6" 14' wb 4w flats 1973. During the 1990s these wagons were used on the Foynes-Ballina Coal and Oil trains, Foynes-Portlaoise Grain Traffic, 27658-27767 were used for Guinness traffic. Post 1996 approx. 40 of these wagons were converted to carry timber traffic including logs from Ennis to Waterford or Clonmel. 30001-98----42'9" bogie flats 1971 BR Ridemaster Bogies ----91-98 steel floors for Irish Steel traffic from Cork 30099-30218---42'9" bogie skeletal flats 1978 IRM model some were fitted with spark proof brake blocks for use on Dublin-Ballina Ashahi liner & Shelton Abbey-Marino Point Anhydrous Ammonia Trains. 30219-30278---47'6" bogie skeletal flats. introduced for keg traffic 1978 Currently used to carry 45' containers-------------------3D printed model available https://www.rmweb.co.uk/community/index.php?/topic/130341-42ft-47ft-container-flat-wagons/&ct=1598912053 30501-30540---62'9" air braked skeletal flat wagons. Initially used on 12:00 North Wall-Cork Liner and Dublin-Galway Night Mail-Liner converted to carry timber post 1994. Possible Hornby Tiphook container wagon https://www.hornby.com/uk-en/tiphook-kfa-container-wagon-93367-with-20-and-40-one-containers-era-11.html Molasses was imported through Foynes tripped to Limerick as a block train, the molasses tank wagons were attached to the rear of scheduled liner trains to be forwarded to their destination. There is a YouTube video of an UP Sligo liner attaching empty bagged cement and empty Molasses tank wagons at Mullingar during the mid 1990s. Initially apart from re-gauging to 5'3" there was little visual difference between the Irish and UK versions of the ESSO tank wagons when originally introduced. The Esso Teoranta wagons lost their ESSO shields and logo during the 1970s, CIE fitted reinforcing fillets between the tank and underframe similar to tank wagons built by CIE during the same era. SSM produce a detailing kit for the Irish tank wagons. http://www.studio-scale-models.com/img/K31.jpg
-
Irish Rail was much more freight orientated before 2000 modelling Limerick or the Junction would require a hell of a lot of freight rolling stock. The best option would be to obtain an Irish Rail Working Timetable (WTT) for the era, the WTT included paths for bagged cement and fertiliser specials in addition to the scheduled liner trains. There were significant changes in rolling operations and rolling stock use after the railway ceased operating mail trains and carrying Sundries Traffic in 1993/1994, there was a greater focus on bulk and trainload traffic post 94 with new traffic flows including logs to the new mills at Clonmel and Waterford, grain traffic for Avonmore Co-Op Portlaoise and molasses traffic (cattle feed) to a number of destinations in the Midlands. The 62'9" airbraked wagons used to carry Liner & Mail Traffic on the Cork and Galway Lines were converted to carry timber traffic, grain was transported in open containers on 4w & later bogie flats, molasses in redundant oil tank wagons. Excluding the ore and shale trains Bell Liner Trains: Operated until the company was liquidated in 1997 with daily Cork-Waterford & Limerick-Waterford Bell Liner Trains 42'9" wagons. CIE Liner Trains: Two Cork-Dublin Liners, One Dublin-Limerick Liner, Limerick later served by a connection into the 12:00 Dublin Cork Liner, Keg and Container traffic. Keg liners may also have worked from Dublin to Cork and limerick Limerick-Waterford Liner Mail one each way daily. Limerick-Ennis Liner daily trip working from Limerick container and keg traffic Limerick-Roscrea Liner daily trip working from Limerick (pre-1993/4) container and keg traffic. Bagged Cement traffic (usually weekly cycle) Castle Munget to Ballina/Westport/Galway/Tralee/Cork/Roscrea/Clonmel I am not sure if Waterford and New Ross received bagged cement form Limerick or Drogheda Bulk Cement Castle Munget Athenry, Cork, Waterford (also served from Drogheda) Fertiliser: Originating points. Arklow (NET/IFI) New Ross (Albatros), Foynes, Galway to destination points in midlands south and west. Deport. Athenry, Ballina, Castlebar, Claremorris, Clonmel, Cork, Ennis, Faranfore Mallow, Nenagh, Thurles, Rathluric, Rathmore, Tralee, Waterford, Westport. The majority of fertiliser depots were capable of handling a train load. Fertiliser traffic from New Ross or Foynes was likely to have been routed via Limerick and Athenry to destinations in the west