Jump to content

CB&PR 2-4-2 locomotive

Rate this topic


Recommended Posts

Posted

I was at the maritime meruseum in passage west this afternoon and they are holding a railway exhibition 

11FF68A1-80AF-49A6-83AA-C1770AC5D611.thumb.jpeg.fdbaa7634a17506c8895501aa789b111.jpeg

I spotted this locomotive to one side. A replica of the 2-4-2 locomotives that this line used to use 

5E44FE03-BF6E-47BE-9C57-C9096457D40D.thumb.jpeg.807b61bf6b0ec96d47c2d771e33ced3b.jpeg

629D6A03-9BC1-4B1C-917E-D6D12A9AD7A0.thumb.jpeg.02d3271c0c0201c413afe9e4e7cb0ff2.jpeg623AF999-1EAD-4A3D-BB00-0CB7281E9A4E.thumb.jpeg.a2e93b413a4d44c4c02aaacb2c71f69b.jpegED7A4534-A41F-4A9A-B137-5F0DCB8BCA05.thumb.jpeg.2cd768a1e3b447c366152c9ccc2accb4.jpeg

it had a rather tragic story behind it, as seen below 


“In 2006 a young man & railway enthusiast, John Davies, of The
Green, Passage West, commissioned this model of a CB & PR engine
& carriages from an Australian model maker, unfortunately, the
completed model was delivered to John's home a few days after he
had sadly died.
Passage West Maritime Museum wish to sincerely thank Mr Terry
Davies, John's Dad, and John's sister Kelly who have kindly loaned
this model
to the Museum for the exhibition.”

 

it said to have cost over 4 grand in 2006 money. 

  • Like 7
  • Thanks 1
  • WOW! 3
Posted
37 minutes ago, Georgeconna said:

They ran that at a model show a few years back I'm sure. not even in a case!!! 

It’s still in full working order I’m told. It last ran at another event in the same museum a few years back.

 

  • 1 month later...
  • 2 weeks later...
Posted (edited)
On 16/8/2022 at 10:16 AM, Horsetan said:

The thing that strikes me about the CB&P engines is the triangular, almost minimal, buffer beam...

Easier access to cylinders I guess. Less rural than the C&L or T&D, no need for a hulking great buffer beam and cowcatcher. Only one ungated crossing at Passage.

Edited by minister_for_hardship
  • Like 2
Posted
52 minutes ago, jhb171achill said:

Fastest narrow gauge engines in Ireland, even beating the NCC ones. I understand they could reach 50mph. They certainly LOOK as though they could!

Despite being so near to what is now ringaskiddy port. I can imagine That speed was far more important then power on that line 

Posted (edited)

Rather unusually for an Irish railway, it was more of a passenger than a freight line, and snappy running was pretty key to the operation. The double track section - which testifies to the traffic density either envisaged or achieved - was AFAIK unique in Irish NG (there were a few sections of parallel single lines eg at Ballinamore). The CBP locos which ended up in Leitrim gave a good account of themselves and lasted to the end in 59, although that long wheelbase barred them from the Drumshanbo line. Elegant locos in their way, although the NCC tanks in full maroon livery take some beating. 

Edited by Galteemore
Posted

Yes, it was indeed the only double track line on the Irish narrow gauge; fully so, signalled as such, etc., despite being singled shortly after the GSR took over. It was also the fastest, and the only narrow gauge commuter railway; three "unique" qualities on this short, and short-lived line. Perfect site for a CLUAS these days.

  • Like 1
Posted
16 minutes ago, minister_for_hardship said:

The only(?) Ng Irish line with a subway between platforms instead of a footbridge or barrow crossing at Carrigaline.

Very probably; can't think of any others, unless one counts the platform subway at Ballymena which some NG passengers would have used......

Posted
3 hours ago, jhb171achill said:

Yes, it was indeed the only double track line on the Irish narrow gauge; fully so, signalled as such, etc., despite being singled shortly after the GSR took over. It was also the fastest, and the only narrow gauge commuter railway; three "unique" qualities on this short, and short-lived line. Perfect site for a CLUAS these days.

If the Dublin underground is anything to go by, me…a 19 year old may never see the project progress much further. Then multi million feasibility studies!

 

although I believe the plans currently for the Cluas re-use Blackrock station ….but not much else of the old CBPR. It’s a shame Carigoline is outside the city boundary otherwise the Cluas would go there along that (reasonably) well preserved trackbed 

  • Like 1
Posted
42 minutes ago, Westcorkrailway said:

If the Dublin underground is anything to go by, me…a 19 year old may never see the project progress much further. Then multi million feasibility studies!

 

although I believe the plans currently for the Cluas re-use Blackrock station ….but not much else of the old CBPR. It’s a shame Carigoline is outside the city boundary otherwise the Cluas would go there along that (reasonably) well preserved trackbed 

I doubt that my five month old gransdon will see it completed......... unless the NTA and Fine Gael cease to be..............

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use