-
Posts
2,684 -
Joined
-
Last visited
-
Days Won
69
Content Type
Profiles
Forums
Resource Library
Events
Gallery
Blogs
Store
Community Map
Everything posted by murrayec
-
Hi Thanks guys for the comments closetmodeller- an electrical pick-up pantograph would be great, but both the track and the catenary would have to carry power which adds more complex matters to peoples layouts. So far all DARTs sold run on tracks without catenary- though I could be corrected on this. Some intend to install it. I looked at powered pantographs and they have their problems with their springie joints and the like. The best ones are the diamond type as seen on the German models but so far I have not seen one like a DART murrayec
-
Hi All We have been very busy over the last few months and not had a chance to progress things, so here is one.... David Holman, in his blog today was discussing layout display lighting, its something I was thinking about on the Modular System and he prompted me to do this. Here is a sketch of a lighting standard system that could be used. I do not think it should be mandatory, up to the modeller to decide. The idea is a post up from the back of the layout and out over the layout with a bracket fixed to take clip on lighting. I reckon only one is needed per board, as two lamps can be fixed to it. I did a quick search and found Ikea have a clip spot lamp 'Lagra' (no bulb) for €3.50, the lead is 2m long and it can take an LED bulb. The standard is fairly simple construction with off the shelf parts- MDF, 22mm metal electrical conduit with fittings to suit, and screws n bolts. Fire back comments if anyone has ideas.. I am just completing a drawing for my Seapoint Martello Tower layout, which is based on three boards- two transition boards and the feature board. The transition boards throw the track to the back of the feature board so that the Tower and a bit of water can fit to the front. I will post up a drawing when complete murrayec
-
Hi David Excellent tip for display lighting a layout- we never thought of it for the Modular Layout System featured on this forum. I have to put on the thinking cap and prepare a drawing. You've sparked an idea... Thanks murrayec
-
Hi That's very well done- 'A handy man with a bit of Dirt' murrayec
-
Hi On the Hibernia... Here is a slide show motion study of the Bell-Crank and Drive Rod. Prepared from screen captures of the drawing for the loco model. It was prepared to prove the crank and rod would not foul the chassis. [video=youtube_share;PfJLEgPB4Ho] It's a mad looking thing- one of the main features that attracted me to the locomotive. murrayec
-
-
Hi Dave Look at what I got today- to save me fingers! I wonder could I do a Glenderg on it and turn it into a DART coach? murrayec
-
Hi I was just looking back over the thread and had a thought on the inspection car motor- a Thenshodo spud has a lower profile than the BB motor it may fit the purpose better and they are cheaper. I use them for the lower profile reason, I do not have to cut a hole in the floor for the motor to stick up thrugh for the BB, I just drill a hole thru for the screw on the Thenshu..... couldn't resist that!! Branchlines again for spuds murrayec
-
Hi All Here is a short video of two DART25's on the test track... [video=youtube_share;ZvqIV9ozQ6o] I run them for a few hours, starting with Mr Rice's recommendations- run slow for 10 mins stop and let the motor cool down, then run other direction slow for 10 mins, stop and let the motor cool down. Repeat this until up to half speed and then add the van and run both directions for 10 mins at half speed. Any problems that show up in the beginning stages are sorted and final running in is up to the owner. It takes a few good runs to bed in the axle bearing bushes in the bogies Both ran very nice from the onset murrayec
-
Hi enniscorthyman Well done on the bubbles, they look amazing in the outdoor shots- looks like they've been in service for years, i think its the wood that adds that character. I see you have a few more to do! Branchlines are the guys for Blackbeetle motors if you cant source it elsewhere murrayec
-
Hi Here are a few shots of the business side of the DART model. Sporting my new cast white metal boxing and screw on lid. As you can see its getting pretty tight in there with chip, pantograph arc light control, socket and connectors, and an MS weight! Yet to try and fit a speaker.... The skirts are cast white metal also. murrayec
-
Hi Phil Love the puddle and point throw, as said before these little additions have an amazing affect on the scale also I see the cow has elevated status, very nice murrayec
- 219 replies
-
Hi Tony Looks a great layout, I was just thinking the same thing- you have some tight points turns there as BosKonay noted, get your layout into some track plan program and see what happens! The stobart rail 201 looks great, I'd do it, but remember its fictional murrayec
- 30 replies
-
- translink
- ni railways
-
(and 3 more)
Tagged with:
-
The standard is 24 passengers. They are a nightmare, always arriving late, leave their feet behind, and require Trans7 to stay in place.... murrayec
-
Hi BosKonay You've come out! I'm starting on yours next week in an initial batch of six, I'll work on the six until I'm frustrated again and then work on individual orders at a time. Construction will go a lot faster this time as I have some new jigs and things to help. murrayec
-
Hi Broithe Not fully, the driver is standard but the passengers are an option. This driver is Oisin McDonald by the way, they are named! murrayec
-
Hi All Just went over the 50,000 views today, I'm chuffed... Here are a few shots of DART 05 just coming to completion Test running in the morning and off to its owner murrayec
-
Hi jhb171achill I do like the art of graffiti! but not what's available to view on the towers and the whole line from Bray to the city, and further. There is not a gram of art in it, it's just vandalism.... murrayec
-
Hi Walter Excellent, you are recovered, I hope to 100% Look forward to seeing you Sunday murrayec
-
- 219 replies
-
- 2
-
-
-
Hi I keep all the plastic- hope to make an injection moulding machine on my pillar drill! I have the heaters and the thermo but time is needed to turn some metal and bash out the moulds...## murrayec
-
Hi 1,000!... That's a factory murrayec
-
Hi Tony Great to see you posting the development of your layout Shapeways would be expensive, I'd go with the Kirley option. That voyager looks like it tried to get under a low bridge! murrayec
- 30 replies
-
- translink
- ni railways
-
(and 3 more)
Tagged with: