Jump to content

Middlemark

Rate this topic


Recommended Posts

  • 1 month later...
Posted (edited)

The lower double track section of the upper scenic level has been extended around the western end of the shed. Ā The curves were spaced to permit the Rapido APT-E and Oxford Railgun to pass on opposite tracks without clashing.*

DFF5DB5D-BF96-4530-9914-C4D7DE89B926.thumb.jpeg.b261889d446dcd1f3bcb84498d2cbdc8.jpeg

82B14AF9-CEA3-403F-A279-6C736E2D41C7.thumb.jpeg.cbb1b7b54a8cb6b4e7d5bb306ca072fb.jpeg

8FC0B76C-DAA9-408B-BDBE-9DA764CC58D0.thumb.jpeg.d65bf00a670f7b9d811c4028b65d74dd.jpeg

We have had made a loco running-in/testing station to our own design in laser cut plywood.

75E984A3-1A11-4D3B-97EB-CE3F8FBD5BC0.thumb.jpeg.6db552a5fba9b3b4e044f6aeeeee0055.jpeg

Cheers

Darius

Ā 

* As happened more frequently than you think in real life. Ā Not a lot of people know that…

Edited by Darius43
  • Like 1
  • 4 weeks later...
Posted

Track to lift-out baseboard section over the helix cut. Ā This allowed me to get inside the helix and give the track a good clean.

3AE45867-913D-4A91-98CD-52946646B5CA.thumb.jpeg.c5c848b6d907a0297592280f075bd8eb.jpeg

C2A9CAB6-93DE-41B4-A52E-78D32A5E6C29.thumb.jpeg.1efb4ebadfd9ad4f99be6c8199b67d38.jpeg

Cheers

Darius

  • Like 3
Posted (edited)

Started with these:-

6D320493-E9D6-49E4-A5EC-7D4DE71AE332.thumb.jpeg.66d81ca0df4d71efd32a38d88846f5ab.jpeg

Single and double tunnelĀ portals combined.

E7287F29-89F7-4055-8071-94A63CCFD019.thumb.jpeg.20a881aaa58dd8bc24d172bc2a9f0e1f.jpeg

A722194B-6AE2-4B6F-82EC-DA210B22A07C.thumb.jpeg.e41619006dba7fcde3b95c6d8f0221c4.jpeg

105CA7E7-A463-4378-A42B-0D3DB9219682.thumb.jpeg.32d18559927fbf2c8bd4d75eb0ff6d90.jpeg

CFE4019A-4A73-4DCD-863B-AABE58A35FCF.thumb.jpeg.a77d199ee016021be004bf9a53bd47bd.jpeg

BBA5860E-9615-4670-81D6-1AD3B35D31F3.thumb.jpeg.34b4eafe4ce7d527b32c76df6ebfc309.jpeg

These wereĀ cheap portals sourced on eBay and made from some flexible pvc/polyethylene material that was impervious to plasticĀ magic, cyano and butanone (MEK). Ā 5 minute epoxy worked though.

I used offcuts from the ā€œremovedā€ wing wall to make the wall joining the two portals. Ā The whole was sprayed with grey primer and then a dilute wash of track colour and black.

Cheers

Darius

Edited by Darius43
  • Like 2
Posted

More ballasting today - the lift-out section above the helix - and some buffer stops.

DC8261AF-7F39-4018-8699-0389AB065852.thumb.jpeg.2f3573d79f46413940ea5c912b66442d.jpeg

2F8640F2-9C52-4699-A265-7C7574F9BE8B.thumb.jpeg.e599a83d6069fe0b1072c269251e7c8b.jpeg

6C0CEFC3-07DE-41E0-B1C2-C86F4DE4D91D.thumb.jpeg.11ad6eb4c4aeb4354f012fde36011981.jpeg

227F760D-9E16-4371-B1BE-5E55137AFFCA.thumb.jpeg.33f8a76c09f868aba501377905c0fc8d.jpeg

AD0DC1C1-BA16-495E-BC29-906941B10D41.thumb.jpeg.0f1a644edf19bb52873b9066cce04e3f.jpeg

9DDD23FF-2A77-426D-8BB7-7F98EA16ABD4.thumb.jpeg.e0702c11566dc5d641e4d26e8cd7ee1c.jpeg

E44E74B1-E781-4387-86A0-0F306DAA15D2.thumb.jpeg.22d2ed28890435051240b0d25b852832.jpeg

F82D8963-D2F6-4647-BAF0-709598A7E7BC.thumb.jpeg.07e6befea7d2a435873221668e5b7838.jpeg

781970CE-2888-475B-A2BE-65656E0BE079.thumb.jpeg.8754cbaf836ed3cf304515b94ff5cef5.jpeg

The buffer stops need a spot of weathering to tone down the ā€œrednessā€ and the track needs to be dirtier.

Cheers

Darius

Ā 

  • Like 2
  • WOW! 1
Posted

RefuellingĀ point canopy underĀ construction usingĀ Plastruct I section and 1mm/0.5mm plasticard sheet.

7DE836F3-B897-471C-AAF2-D739B048B39A.thumb.jpeg.83699c73ea2618b7816b08c09c9f5a88.jpeg

863DFE47-C188-43D7-864E-84A1C88BAC0D.thumb.jpeg.0fbaa3773e0fcf3419b82dafea2ced5e.jpeg

2F1E49F1-0913-4168-B620-AE6FE1848E60.thumb.jpeg.4df2647c32a78008a429e75eb287d991.jpeg

0BB87E04-E9EC-47B0-A28D-C847B32E5B0D.thumb.jpeg.d4625a7e50d91566daf5ab8ffefd6c34.jpeg

F86CD110-73F2-4BA5-BA16-48DF30CB6742.thumb.jpeg.d8e912f02f0c91df2b207265a215f74a.jpeg

425B0C6D-9311-4869-8A96-D913C2CC30FB.thumb.jpeg.c2a4d1ee9fd8fdb3ffa8b6582f898887.jpeg

Now waitingĀ for channel section purlins and corrugated metal sheeting to arrive.

Cheers

Darius

Ā 

  • Like 3
Posted (edited)

Canopy completed and weathered.

2E59C06C-4F95-423B-9CF1-509A794CCC03.thumb.jpeg.90ebaa6a42e63a7fc8bfbb4eb6e4faa0.jpeg

FCA5D9D3-C42C-498B-83AD-185D6D23DBE5.thumb.jpeg.4c7315f1171eae16e5d8f8e1e386cd34.jpeg

951B1311-76A8-4BAC-BBFC-FF6B72B7B9A3.thumb.jpeg.1b9558eed8887b5a1f86a9bcf36c8611.jpeg

4FD8B56C-B506-4A33-B58F-1CD8C4B94893.thumb.jpeg.e15713218a446282dfc402e430772edf.jpeg

3CDA7503-8A5A-434B-8970-89DA0CD83953.thumb.jpeg.211ddb7012484490faee3ef049ef0d2e.jpeg

063B0B08-51B7-4379-86A9-30AEFDE39943.thumb.jpeg.496cc3dc29ce8c5480efc6fb9c310fbd.jpeg

41935AF4-588A-41E7-B222-7E07A18C8B03.thumb.jpeg.bb07592c0c027cc992e25ac03c269228.jpeg

5FAE1E81-8BC9-46EF-9AB4-86AA6D5F6548.thumb.jpeg.f39ee6138828d3efb81b3df3fc7fdbf1.jpeg

The brass rod rainwater downpipes also act as dowels to mount the canopy to the baseboard.

Cheers

Darius

Edited by Darius43
  • Like 7
  • 4 weeks later...
Posted

BackĀ in the shed…

330B39BD-18C1-49CB-A494-093D7BF708FB.thumb.jpeg.a31f3c433e2f106c729f64c8ed6ed2fe.jpeg
Ā 

F2141D4A-BEB9-4364-AAF7-659FFC529B56.thumb.jpeg.6957a218218647aaf68a928baef9f6a7.jpeg

991F3070-3B2B-446D-B039-54056C602892.thumb.jpeg.27204fde6e9e44f11aee810b64dd3080.jpeg

17249935-5418-43C7-9643-AAA6B77A5B42.thumb.jpeg.8d7390667cfc602ab930fd5c435eacde.jpeg

2C8798E5-837D-48EB-865C-6F85CA8CBD68.thumb.jpeg.961100a31c1de85c3c72271f65540ca5.jpeg

DCEC5A25-0EB9-4A73-B9EE-84469C927710.thumb.jpeg.f489629ec9531156513ae7f90d72e023.jpeg

A4A85CB5-0112-4E2F-85DF-20E90B170C2C.thumb.jpeg.44cd3d519dc9c2cb219a5f4e30c8e56c.jpeg

BCA351CD-A641-4E4A-A011-4CAD732BD3F8.thumb.jpeg.de5ba8321492963519c526c866cd4130.jpeg

3C104C92-E7A3-4FC0-8711-AF5875B56802.thumb.jpeg.e4a5c159e699924b69763dafc9ec5324.jpeg

TheĀ model canopy structure is removable and the fuel pumping equipment and drums are just temporarily placed for the photos. Ā 
The whole trackbed and hardstanding Ā area still needs the oily gunk weathered treatment.

Cheers

Darius

  • Like 1
  • WOW! 2
Posted (edited)

LowerĀ scenic level extension to the other side of the shed commenced.
4614EF2F-D52C-4BE3-9B25-0FE3C6299F32.thumb.jpeg.171dc8f78bda51204db609cf52d4d13c.jpeg

360D9C88-902D-4D43-8DB9-5140E759F609.thumb.jpeg.5c3127d1b25f6a22cb6cf1d9228e7adb.jpeg

1D39F658-7E8C-447D-9AEB-74EED5172C8A.thumb.jpeg.3131d43293387bc8e7bb4d421fd76ce8.jpeg

62108992-1FBA-426C-A8F9-06AD8C73FD14.thumb.jpeg.80e447e78e6be01dc1ce50abb9fb4485.jpeg

EDBB0E27-05F0-4628-8931-4D5347210D2F.thumb.jpeg.e1dbe776696049ad242260ef82a96fa3.jpeg

MostĀ of this section will be in ā€œtunnelā€ beneath the upper scenic level so the code 75 bullhead track transitions to code 100Ā using Peco transition track pieces. Ā The code 75 bullhead rail connects ok to the ā€œregularā€ Peco code 75 rail of the transition track piece using standard codeĀ 75 rail joiners.

08930FCA-02BB-4546-8972-FB21B5165D91.jpeg.083df3da79daf0bac25921c01e7b30ff.jpeg

Cheers

Darius

Edited by Darius43
  • Like 2
Posted

Hi Robert,

As this section is in a tunnel we will be connecting feeds from the shed perimeter bus bar to the outside edges of the rails at regular intervals.

Cheers

Darius

  • Like 1
Posted

ProgressĀ this week on a scenic infill for the SW corner of the shed.

6B1BB46F-C2B4-4F95-8424-3A2749A4E687.thumb.jpeg.f725a3dcb394074f0104285f54ebba69.jpeg

8A654D30-BBA5-46CF-B579-75F1AEE9D68D.thumb.jpeg.bfa4d6313b369cb06815ef7b0d491a74.jpeg

AC71746F-CBD3-40EF-98FA-9C8AEDB6D701.thumb.jpeg.0cd45928501080674b1fafe584c6dd3c.jpeg

6E85FE63-B09F-421B-B080-4653A5D3B0EB.thumb.jpeg.e91163e102872c9ade0e3f2345106a9b.jpeg

2A978D70-22E9-49E2-B201-7DDB2F3264C6.thumb.jpeg.3832c8980c41381ee16be2e00b4e23ba.jpeg

F8193CBD-0FD1-4047-A18C-A52FF792F446.thumb.jpeg.ab7415cdc1268d956bdec9fd8d5c9ad6.jpeg

TheĀ polystyrene slabs were packing from some self-assembly steel cabinets that I acquired for the garage a couple of years ago.

The plan is to have rows of terraced houses (Scalescenes) with a slight gradient up to the right-angled corner.

Cheers

Darius

  • Like 2
Posted

Terrific stuff @Darius43, I feel envious of forum members, like yourself, who have such huge spaces to model and Middlemark is going to be seriously impressive. I also love all the models you churn out at a tremendous pace, especially all the Norn Irish stuff. Can I just ask where you sourced that corrugated metal sheeting for the refuelling point as it looks exactly what I am looking for for my canopy at Larne Harbour Station.

  • Like 2
Posted

FirstĀ of about twelve terraced house pairs under construction.

4F092760-EAB1-42A0-85AB-0177B2538003.thumb.jpeg.849ca3488962cc8cbdcec321c2bd05db.jpeg

7FD81169-BC66-4892-92D2-D091DAD741E9.thumb.jpeg.f1224ed412d9d30f9c5bf3f3e1dcc46f.jpeg

EB5D33A5-76FF-4250-9D25-66D82518A6C3.thumb.jpeg.c44cdd0ec470a0e1f77d86114f65c873.jpeg

420C3F51-2FCC-4C8E-B5E5-2586184D7F4F.thumb.jpeg.257ab48755f98f0a9d16059c148a6141.jpeg

BuiltĀ from the Scalescenes download, print and glue onto cardboard kit.

Roofing tomorrow.

Cheers

Darius

  • Like 7
Posted

I hope this project was not done under the " self certification" criterion and that all stages of the project were fully checked and certified.Ā 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

Terms of Use