Jump to content

Wanted auto-ballaster

Rate this topic


PJR

Recommended Posts

There were at least three if not 5 standards per genny on prototypical sets

 

Typical formation is 6 standards with a genny unit at each end. One exception was then they were top and tailed last year working out of Heuston, in that case they were 8 standards with a genny unit at each end but that was the only time that many were used. Irish Rail have 6 genny units and 18 standards, to run as 3 8 unit formations.

Link to comment
Share on other sites

I'd definitely be interested in standards (non genny)

 

I'd love four of them. From what I have seen online and when in Wexford station, it's 6 standard to two generators.

 

When I asked in Mark's models some time back they said initially they hoped to produce more standard wagons to complete the sets but it was dependant on the manufacturer inviting them to place an order as part of a larger run they were planning.

 

Be nice to have a few with the newer logo as well.

Link to comment
Share on other sites

  • 1 month later...
Typical formation is 6 standards with a genny unit at each end. One exception was then they were top and tailed last year working out of Heuston, in that case they were 8 standards with a genny unit at each end but that was the only time that many were used. Irish Rail have 6 genny units and 18 standards, to run as 3 8 unit formations.

Portarlington, 25/4/16

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use