Sorry to drag up an old thread, but were the warning lines on all terminii? I 'think' UK practice is not to have them on a terminus (branch, or main line..()
Continuing the theme of progress on the layout, no matter how small, I tweaked a little Bachmann 'Kiosk' with lighting, some signage and a CCTV monitor. It will be the security hut on the gate of the as yet un-named cement works...
Just need to find a suitably disinterested looking lad in a hi-vis now
Cross posting some links on them from a previous post:
It's detailed on the Sambre & Meuse website.
http://www.sambreetmeuse.fr/?fond=pr...&id_rubrique=1
This German site provides more technical info.
http://www.drehgestelle.de/6/Y25_ba33.html
Am getting the backscenes finished (the viaduct curve still needs a little smoothing, the backscene sheets got squished in the post so were nicely wrinked, tried ironing them before mounting, with not much success.. might try steaming them a little
You're telling me.
I bought a coffee machine, Berlin retailer.
Machine arrived, was faulty.
Shipped it back, got a full refund, and a new machine that I could pay for once I was satisfied this one worked!
Amazing