Patrick Davey Posted Thursday at 15:49 Posted Thursday at 15:49 Lovely work Alan, this class of loco just screams 'GNRI' to me! 1
Tullygrainey Posted 2 hours ago Author Posted 2 hours ago More PPs. The boiler came ready rolled which was a real help. It just needed tightening up a bit on the rolling bars. Boiler bands can be a bit of a struggle to fit. Three cheers for fibreglass pencils to clean up the mess afterwards. The boiler needed quite a bit cut out of it to clear the motor, gearbox and wheels. The danger is always cutting too much away and leaving an unsightly gap somewhere so it's a time consuming exercise - boiler in, mark it up, boiler out, cut a bit, boiler back in again, fit the chassis, check for clearance, repeat until done. The smokebox has three layers and needed a lot of heat to get everything soldered up. I had the temperature controlled iron turned up full and still it was struggling. A trial run at Loughan Quay PPs.mov Time for a tidy up, more fibreglass pencil and a scrub with scouring powder. 2 4
Mol_PMB Posted 2 hours ago Posted 2 hours ago Looking superb - an inspiring build and some useful tips too. 1
Galteemore Posted 2 hours ago Posted 2 hours ago (edited) Wow that’s fabulous. I find guitar band clamps are great for holding boilers together whilst soldering. Know what you mean re cutting out / lots of careful measurements! Something mesmerising about watching those huge drivers ! Edited 1 hour ago by Galteemore 1 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now