Galteemore Posted October 16 Posted October 16 Fabulous. Always a great moment in loco building when the paint goes on! 1
Georgeconna Posted October 17 Posted October 17 (edited) nicely done Patrick. You must be pleased with this one. should really pop when the brass safety valves and other details get their lick of paint. On 18/7/2025 at 2:08 PM, Patrick Davey said: Very kind thanks David All track laid The boards to the left are the short ‘fiddle yard’ extensions. Running line to the left and limestone siding to the right. A big shout out to Alan @Tullygrainey for dropping in to sort the copper sleepers for the baseboard joints Busy work weekend ahead, then next week it will be painting and wiring of the track to look forward to! neat trackwork. Edited October 17 by Georgeconna 1
Patrick Davey Posted October 19 Author Posted October 19 Some small painting details this evening - trying for a more matt effect on the smokebox and running plate, plus the dome has been brassed. 11 2
Patrick Davey Posted October 21 Author Posted October 21 (edited) No need for a caption! Edited October 21 by Patrick Davey 8
Patrick Davey Posted Sunday at 16:53 Author Posted Sunday at 16:53 (edited) The Countess has returned to the Nixon Works for some final detailing and her digital installation. That will leave just the separate etched name and builder plates to round off the build, as well as a cab interior and some other small fittings. With many thanks to Alan @Tullygraineyfor this great work and for this clip of the locomotive running on one of Alan’s superb layouts. And huge thanks to Jamie @J-Mo Arts for doing the CAD of the locomotive, you did a fantastic job there sir! IMG_2745.MOV Edited Sunday at 17:08 by Patrick Davey 3 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now