Jump to content

murrayec

Members
  • Posts

    2,609
  • Joined

  • Last visited

  • Days Won

    67

Everything posted by murrayec

  1. Thanks guys The only bit of the valances overhanging are the steps the rest is more than 50% glued to the footplate, and as I mentioned earlier the steps will be reinforced with brass strip behind supported off the footplate somehow?, the splashers and repairs to smokebox will have epoxy laced on on underside and there are two little air holes at the back of the sandboxes for ventilation!! Eoin
  2. Hi Colin R Would not be much use! the Co Co have ownership and are adamant that the project proceeds as outlined above. There was an opportunity for a serious say in the matter by the public but sadly only a small amount of people- can be counted on two hands, made submissions... The Fry Models will be shown here, if the project proceeds, so don't put off that visit, it just wont be as good as it could be! Eoin
  3. I received communication from Fingal Co Co regarding revisions to the proposed Casino/Fry Model development as follows;- ''Dear Sir /Madam, In accordance with Part XI of the Planning & Development Act 2000 - 2015 and Part 8 of the Local Government (Planning & Development) Regulations 2001-2015 and on behalf of our Client Department in Fingal County Council, Economic, Enterprise and Tourism Development, we are writing to acknowledge your submission at planning stage, and report on the outcome of the planning process . A Chief Executives Report in relation to the planning proposal was brought to the Howth/ Malahide Local Area Services B Committee Meeting on 7th December 2016. Agenda Item 7A. This report including associated drawings is available on the Council’s Website http://meetings.fingal.ie/documents/s35335/Item%20No.%207a%20-%20Casino%20Building.pdf and we enclose a copy for your information. You will note that minor amendments were proposed to reflect concerns raised in the public observations received. The amendments will also provide more flexible spaces for an exhibition layout. The proposed amendments increase the internal floor area of the extension by 35 sqm. The overall appearance, scale and location of the buildings remains consistent with the original published documentation. The proposed amendments are described in outline as follows: The outbuilding will be physically connected to the new extension and all buildings on the site will now be under single roof- not separate buildings as before. This will allow greater scope for more working train layouts and more exhibition space in keeping with the general submissions received commenting on possible layout. The proposed café use for the Outbuilding was to be the subject to a detailed business plan, it is now proposed that the extension to provide a separate kitchen area will be omitted which limits the potential for a significant cáfe on the site – the outdoor amenity area associated with the original proposal will also be reduced in scale and relocated in the interest of residential amenity. Scope remains to provide a limited coffee shop within the outbuilding with access to reduced extent of outdoor amenity area subject to detailed business plan. Overall the proposed amendments change the proposal by increasing the floor area of the extension from 225 sqm to 260 sqm. These amendments were made to address the concerns raised about the scale of exhibition area proposed, and reducing possible impact on residential amenity at the Casino apartment development. Amended drawings describing the proposed changes are highlighted: 15-189-p-101_r: Site Location Map (Existing) 15-189-p-102_A: Site Layout Plan (Proposed) 15-189-p-103_r: Existing Site Plan, Ground Floor & First Floor Plans & Elevations 15-189-p-104_A: Proposed Ground Floor Plan & Elevation facing South East 15-189-p-105_A: Proposed First Floor Plan & Elevation facing North West 15-189-p-106_A: Elevations and Section 15-189-p-107_r Proposed Landscaping Layout Following discussion at the Howth Malahide Services B meeting, the Local Area Committee members recommended that the report and amended proposal was adopted by the Full Council at its meeting on Monday 12th December 2016 (Agenda Item 23). The client department now intends to proceed with developing the proposal as amended.'' A pdf file of the full reply is attached and includes drawings. Bottom line is they have increased the display area by 35sqm for a layout but it is still a narrow hall. They have confirmed that no workshop facility will be provided and all work n maintenance will be done after hours or at another location. And very important- the toilets are now indoors!! Eoin 2016.12.07 CE Report to LAC.pdf
  4. The Dublin & Kingstown Railway Company- the first! Built beautiful Edwardian/Victorian station buildings like cottages n gate lodges of that time, each had their own little quirks- Blackrock station had a bit of Nouveau/Italian buzz, and many were decorated with eaves supports, decorative barges, and typical at that time decorative chimney pots. Also a place nicknamed 'Privo' with its Italian footbridges, harbour, and Greek bathhouse- now removed, all to appease the landowner. As time went on the Southern railway company continued on with the tradition and built Dun Laoghaire station- Italian, the later Dalkey station and say Greystones station, still employing the E&V style. Sadly these building have been taken over by modernisation and some gone, but many of the old style details can be glimpsed here and there... https://www.google.ie/search?q=dublin+kingstown+railway&client=firefox-b&source=lnms&tbm=isch&sa=X&ved=0ahUKEwi-rcLlkJXUAhUCBcAKHVguDJ0Q_AUIDCgD&biw=1280&bih=890 Eoin
  5. Thanks guys for comments Ironmongery fabrication this evening... Smoke box door lamp rail, sand box actuator rods, footplate hand rails, and the safety valves. All in .4mm NS wire with some brass n aluminium tube for the valves. Paper strips were used for the detail on the chimney and along the top of the tanks all the way to the back end. The safety valves was good fun, the solder on the NS wire broke while test fitting the assembly, I could not re-solder because the tubes making the valve bodies was epoxied and that would have been a mess, I'll silver solder the next time I make one of these. Thats a Kadee coupler spring between the valves. Eoin
  6. Ah Kirley, would you stop, you have been one of the great contributors to this forum, sure look at those amazing photos of your stock you last posted- that would be sorely missed. Listen to wrennie- he's a big B***x and we all hate him but I do agree with him;) don't do it, take a few weeks away from this annoying place and things will look different when you return.... ...and I will finish those bogie sides, I promise I better run I can hear wrennie's car starting! Eoin
  7. until
    At Bray Wheelers Clubhouse, Schools Raod, off Boghall Road. Bray. From 11.00 to 4.00
  8. A bit of body work done today Splashers, sandboxes, coal bunker infill, valance & steps, made in styrene, all just propped in position for the photos. I think the valances will have to go on last and have a bit of brass reinforcing behind the steps! You cant see it in these shots with the glare of the white styrene but the sandboxes have a nice little filler cap on top... Eoin
  9. Hi Mark Flowing in the footsteps of JHB I see! with the upside down photos:) The wires look like they are still making contact, check to see if many strands are broken, even better check it with a meter continuity test, if there is you'll need to solder and insulate them. If still intact stick a blob of tek7 or the like on them to insulate and reinforce them.... If its a Mac camera you use and you take a photo with the camera upside down Windows cannot rotate it automatically like a Mac, you have to do it manually Eoin
  10. Hi Have you ever wondered what 6 sets of two car DART bogies looks like;- Contents;- 7 no. Modified motors and wired for DCC. (there is two motors in one of the sets) 7 no. Motor outriggers made up in brass and blackened. 18 no. Brass bogie frame etchings, folded and soldered and blackened. 72 no. Wheel bearings soldered in. 18 no. Press buttons soldered on. 48 no. Plastic bogie sides cast, processed and glued on. 36 no. Wheel sets installed. 18 no. Brass chassis connections, etched, folded and soldered to the chassis I have posted this list so that some may be able to grasp what is going on here! this is the final batch of three batches of 6 sets of running gear, so multiply that list by 3 and that's for a total of 18 sets. The processing time for this batch only was in the region of 8 weeks, while at the same time other processes on the DARTs was taking place- body assembly, chassis components fixed on, body interiors made, wiring loom, directional lights, cast pantograph, and final assembly of complete sets. 4 sets have gone out to customers and two more are just about to. Some see this in isolation- their order only! they think its liner- start at the beginning work straight through to the end and give me my DART! Well its not, the nature of batch building is you make all the same parts at one time and then move on to the next, not necessarily in an order that DARTs can be part assembled as you go. Some processes go on for months and are similar to process that might be only needed at the end but everything is set up so that end item is made first. This is where storage boxes come in.... Bottom line is, I'm working along 3 to 4 days a week on it, all major components are made and most of the time from here on in is assembling the remaining 12 sets.... I appreciate the majority of the order's patiences and for the others 'Damn them for they know not what I do' I will never build a batch of DARTs again, and there will be a cost adjustment for future orders on these models. I'm looking at a conversion DART from a ?? (like the N DART Conversion I posted in the other thread) as this seems to be more what people want to pay for and wait for! Eoin
  11. ....phosphoric acid! its phosphoric Eoin bloddy spel chker!! Eoin
  12. Hi Have to agree here with TDR's words, sorry Richey The main problem with types of flux is what your doing after the thing is soldered- say on a fine delicate model if one uses plumbing or electrical fluxes you have to be diligent in cleaning they are corrosive, can harden incredibly, and hide in seams difficult to clean out without damaging fine detail! Then you spend time applying beautiful layers of paint only to find in a couple months time your paint along that seam is corroding! that may be OK for the weathered look but not for pristine stuff. Using paint friendly flux is a better bet, Carrs and phosphorous fluxes are very paint friendly- one can dip the model in phosphorous flux, not clean it off, let it dry and paint it- it's an excellent surface for paint to adhere to. Using a pickling solution after soldering a model is a very good idea and can safeguard against creepy things happening later on..... There is a difference Eoin
  13. Hi Baseboard Dave shifted a fair few at the shows we attended up to the new year Eoin
  14. ?? Astronomy, archery, hunting, shooting & many more current uses.... Eoin
  15. Go for it Borithe???
  16. Hi My Mom made elderberry wine many moons ago- that could be used for paint stripping!! Eoin
  17. Hi roxyguy I'm super detailing it and painting it black n brown with CIE logo, I know its not Irish but I like them.... Eoin
  18. Hi roxyguy This came to me very crudely hand painted green with enamel oil paint, popped it into MMO in bag, 15 minutes later it came out just as you see it in the photo after a rinse in water Eoin
  19. Yes, don't do it...... You could use DIY stripper but only water base and test first!!
  20. Hi roxguy Try Mr Muscle Oven in a plastic bag, leave for about 15 minutes and squidge it around in the hands while in the bag and see if the paint comes off, wash with water I use this method for most applied paints- I did recommend this method to Peter recently but it did not work for him! Also IPA seems to harden up paint when it drys, so MMO may not work now, also IPA is very risky stuff to use on plastic models- paint can be removed but so can the body shell!! Eoin
  21. Thanks Noel Yes split chassis require a bit more work, The decoder will be connected to two little brass screws that will be tapped into that shiny cut I just made on the top- the wires can be soldered to the screws far easier than to the die-cast metal Eoin
  22. Hi Noel OOPS! I gave a link to the soldering paste! it should have been to the soldering & flux head page..... but one can find it from there. Ordinary electrical solder can be used on brass work, but I recommend don't- its already fluxed with messy stuff and with this solder the flux is going in at the wrong time- with the solder! Its a better join to flux independently, heat the work with the solder on the iron, the flux boils and cleans the metal and then the solder flows where the flux once was. Most brass solders have a little lead in them, lead is good for this, it helps the solder to flow beautifully and create a good join. Just work in a well ventilated area and use a soldering extract fan if possible- sure I used to drink me water through it in my gran's old house when I was a kid and I turned out normal:SORRY: Best flux I use is 12% phospheric & water- see my tips on soldering in the Workbench thread http://irishrailwaymodeller.com/showthread.php/3869-Soldering-Tips-by-murrayec?p=59978&viewfull=1#post59978 Eoin
  23. Bashed some metal this evening.... Split chassis was taken apart to remove the gears, seal up the motor with masking tape and put some packing into the split so that the machine vice would not crush the plastic insulators. First I machined out the recess for the Kadee box on the under of the chassis, this was very close to one of the screws so I went into it, through the brass contact and insulator until I could see the threads of the screw and stopped there! It worked, just enough clearance to get the Kadee at the right height. Next was machining out the space for the DCC chip in the top of the chassis, took off 3.5mm. Now you see it Now you don't The Kadee box is fixed to the chassis keeper plate with a counter-sunk screw, just made it! had to sand the box a bit to adjust the level. and loads of space for chip n wires Eoin
  24. https://eileensemporium.com/index.php?option=com_hikashop&ctrl=product&task=show&cid=956&name=solderpaste-188-deg-50gr-jar&Itemid=189&category_pathway=1124
×
×
  • Create New...

Important Information

Terms of Use