Jump to content

Sulzer under construction at Inchicore

Rate this topic


Recommended Posts

Posted

Nice photo of the sulzer.There are a few photos of the A class

Under construction at the Manchester works,one in a IRRS journal

the other in the ITG journal showing a crossly engine being put

into a A class,I presume around 1955.

Posted
Nice photo of the sulzer.There are a few photos of the A class

Under construction at the Manchester works,one in a IRRS journal

the other in the ITG journal showing a crossly engine being put

into a A class,I presume around 1955.

 

And there is a film also of building and testing in manchester.

 

M.

Guest hidden-agenda
Posted

A brilliant pic but scary to think that it dates from the late 40s early 50s. Its a pity there,s not a few more pics around showing it in various stages but a surprise to see this pic and thanks for sharing.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use