Jump to content

Connemara Railway project.

Rate this topic


Recommended Posts

  • 1 month later...

Maam Cross Connemara Railway Project continues at pace with an early summer opening date to be confirmed in due course. 


The volunteer’s erected a wooden fence today to improve the appearance at the entrance to the station,


Some more 804 gravel was spread on the down platform and preparation was made for the arrival of on site WCs which will shortly be delivered to the station. 


In the last photo the section signal has been connected and can now be worked by pulling No3 lever in the signal cabin. 
 

IMG_3191.jpeg

IMG_3190.jpeg

IMG_3189.jpeg

IMG_3192.jpeg

IMG_3193.jpeg

IMG_3195.jpeg

IMG_3194.jpeg

IMG_3197.jpeg

IMG_3198.jpeg

IMG_3199.jpeg

IMG_3187.jpeg

  • Like 18
Link to comment
Share on other sites

Just now, Gabhal Luimnigh said:

Great progress Noel, fair dues to you and the gang, I'm looking forward to seeing it open, great pictures too, dramatic looking sky. 👏

And you are more than welcome to join us Denis. 👍👍

  • Like 1
  • Agree 1
  • Thanks 1
Link to comment
Share on other sites

  • 2 weeks later...
Just now, DJ Dangerous said:

Every week, more and more achieved!

Out of curiosity, who else on the forum is chipping in with a bit of manual labour?

The clue is in one of the recent photos…..

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use