Jump to content
  • 0

Peco Code 75 or 100 Wooden Sleeper

Rate this question


burnthebox

Question

Hi guys, while I don’t as yet have a layout, I’m wondering about the choice of track that would be best suited to my plans.  I would much prefer from what I know, ( which is not a lot when it comes to laying track,) that Peco code 75, wooden sleeper would be the best for me..!  I don’t know if this track actually exists..! I’m hoping to plan my layout for the late ‘40’s to about late 90’s !  Any help / suggestions would be much appreciated,  TIA
BTB

Edited by burnthebox
Text
Link to comment
Share on other sites

31 answers to this question

Recommended Posts

  • 0
2 hours ago, burnthebox said:

Hi guys, while I don’t as yet have a layout, I’m wondering about the choice of track that would be best suited to my plans.  I would much prefer from what I know, ( which is not a lot when it comes to laying track,) that Peco code 75, wooden sleeper would be the best for me..!  I don’t know if this track actually exists..! I’m hoping to plan my layout for the late ‘40’s to about late 90’s !  Any help / suggestions would be much appreciated,  TIA
BTB

Hi Paul. All my life I used  Peco code 100 streamline, which I was very happy with in my ignorance, but I've since switched to code 75 for new work which I really like. Visually there's not that much difference, especially when ballasted and weathered in. I've also switched to electrofrog points which is a bit of a PITA as regards a bit of extra wiring but the Cobalt point motors help with that as the frog polarity switching is all local. Some old Hornby and Lima stock may not run over code 75 points due to the pizza cutter wheel flanges 20-30 years ago on rolling stock, especially old locos.

Edited by Noel
Link to comment
Share on other sites

  • 0

Hi guys & thanks, I’ve already wondered about Code 75 & 100 Bullhead, simply because I don’t understand the difference, with the +’s  &  -‘s & associated with each type, I also don’t know exactly what’s the best when it’s Wooden sleeper, ( does that type of sleeper make any difference ) also the type of electric points to use where you use Flexitrack, ( I’m beginning to get scared already....) In a nutshell, can you use Code 75 Flexitrack Bullhead with wooden sleepers..! just to get me started,

Paul

Link to comment
Share on other sites

  • 0
34 minutes ago, burnthebox said:

Hi guys & thanks, I’ve already wondered about Code 75 & 100 Bullhead, simply because I don’t understand the difference, with the +’s  &  -‘s & associated with each type, I also don’t know exactly what’s the best when it’s Wooden sleeper, ( does that type of sleeper make any difference ) also the type of electric points to use where you use Flexitrack, ( I’m beginning to get scared already....) In a nutshell, can you use Code 75 Flexitrack Bullhead with wooden sleepers..! just to get me started,

Paul

Code 75 flexitrack and code 75 points fit together. Bullhead requires bullhead points as the rail profil (is shape) is different requiring special fish plates. Also the last time I checked there were very few types of points available for bullhead, but it does look great. I don't think its possible to use Bullhead track with code 75 points, but I could be wrong.  I'm in the middle of laying code 75 at the moment (pic below).

Have a look at this thread. Ballyercall uses code 75 Bullhead track. 

 

 

IMG_6511.JPG

Edited by Noel
Link to comment
Share on other sites

  • 0

Lads,

Interesting that this topic came up as I am about a month out from actually starting on my layout here in the US. I went to my local store yesterday who have only code 83 from Peco and code 100 from Atlas. I would prefer to go with Peco but is there much of a difference besides the height of the rail between code 83 and code 75?

Have no track plan yet but I am about finished prepping the room where it is going in and well I am also looking in a couple of weeks of getting baseboards to get going, all going well. 

Mark

Link to comment
Share on other sites

  • 0

The rail code number is the rail height expressed in Thou (or thousand of an Inch)     thus Code 83 is 8 Thou or .0008" higher than Code 75.

Peco Code 75 and 80 track systems were designed for two totally different markets.

Peco Code 75 Streamline was designed to provide a closer to scale rail height than the existing Code 100 for the UK and Continental markets. Pointwork geometry is similar to their existing Code 100 Streamline system.

Peco Code 83 was designed as an NMRA (National Model Railroad Association) compliant system specifically for the North American market and pointwork.  

Code 83 point geometry is based on prototype practice and quite different to the Peco Streamline systems. 

For someone starting out with their first layout the difference is mainly appearance between Peco Streamline Code 100 and Code 75 track systems, both are available with wooden sleepers, with a similar range of points and crossings.

Peco provide a useful summary of their different "Streamline" track systems https://peco-uk.com/collections/streamline/75?page=2&view=12&layout=

Code 100 is the safest option for someone running older (pre-1990) models with deeper/coarser wheels particularly Lima, Triang,  Triang-Hornby), Code 75 with the lighter rail section is probably easier to work with (easier to curve) than the larger Code 100 rail section.

 

Edited by Mayner
Link to comment
Share on other sites

  • 0

All model track is a compromise, unless you go along the P4 route and it is the same in the other scales. Peco code 100 was designed as something robust, but better than set track. However, the sleeper spacings are wrong for British practice, never mind the gauge being 4.5 mm too narrow for Ireland.

 Code 75 track improves things because as well as finer rail, the sleeper spacing are better, though note that this does make the flexitrack less robust than code 100.

 Still want to run older stock? Probably no option but code 100, but disguise it with careful painting, balllasting and a low viewing angle, then it will look much better. All newer stock with finer flanges? Code 75 will look so much better.  There again, how adaptable are the new models coming out these days? Can the 121 and A class be easily converted to 21mm? Likewise all those fine new wagons. Food for thought, maybe?

  • Like 1
Link to comment
Share on other sites

  • 0

Hi guys & many thanks for all your help & suggestions, so tell me this, is Peco Code 75 Streamline & Flexitrack one & the same, as I’m thinking of using Peco Code 75 & has anyone seen what Everard Junction did by snipping the sleepers & spacing them to make the track appear more realistic..! It’s a long process but the end makes a difference,

BTB

Link to comment
Share on other sites

  • 0
9 minutes ago, burnthebox said:

Hi guys & many thanks for all your help & suggestions, so tell me this, is Peco Code 75 Streamline & Flexitrack one & the same, as I’m thinking of using Peco Code 75 & has anyone seen what Everard Junction did by snipping the sleepers & spacing them to make the track appear more realistic..! It’s a long process but the end makes a difference,

BTB

Hi Paul, Yes I watched Richard's video on that, the end result look well, but not worth the effort IMHO. Our 16.5mm gauge track still looks like narrow gauge, and few are going to the extreme hassle of re-gaugeing their locos and all their rolling stock to run on handbuilt 21mm track. So for me code 75 is the biz. A great selection of points. What's wrong with using it out of the packet?

Link to comment
Share on other sites

  • 0

Hi Noel & thanks, yes I agree to go to that EJ trouble is worth it in the end, if you want to go that far, but I’m not looking for a professional display, but something that looks the business is what I’m looking for, so if I can buy Peco Streamline Code 75 Flexitrack, Nicole Silver with points & crossings, well that’ll do me, & I forgot to mention I’ll be running relatively new stock as at this minute the older items I have are UK & I’ll be selling any/all of that & I’ll be concentrating on Irish, with only the occasional run of something UK, I only started buying stock in or around 2004, ( would that be OLD STOCK ) but there maybe some rolling stock that might need sorting out..!!! 
Paul

Link to comment
Share on other sites

  • 0

 

On 7/12/2020 at 8:27 PM, mmie353 said:

Lads,

Interesting that this topic came up as I am about a month out from actually starting on my layout here in the US. I went to my local store yesterday who have only code 83 from Peco and code 100 from Atlas. I would prefer to go with Peco but is there much of a difference besides the height of the rail between code 83 and code 75?

Have no track plan yet but I am about finished prepping the room where it is going in and well I am also looking in a couple of weeks of getting baseboards to get going, all going well. 

Mark

Some thoughts. 

For someone in Nth America the best choice is probably code 83 because it is readily available and it's my understanding that code 75 is actually slightly under scale.

Also for someone in Nth America using code 100,, a good option is to use Peco point work with Atlas track. I found Atlas easier to lay and the sleeper spacing is wider (more prototypical than Peco). Granted the sleeper colouring is different but this will most likely be painted anyway.

  • Informative 1
Link to comment
Share on other sites

  • 0

Does anyone know a safe year that one could use as a guide where Hornby rolling stock and locomotives should be ok to run on code 75? I know I am looking at code 83 over here in the US but I should be use that as a guide for this question. I have Irish, British and American stock so it is whatever I am in a mood to run with. I will not part with any rolling stock as well before Murphy Models, I was getting some Hornby stock and I will not part with it. Even if i cannot run it on code 83 I am keeping the model and I am crazy enough to buy it again and keep the older one!!!

Link to comment
Share on other sites

  • 0
2 minutes ago, mmie353 said:

Does anyone know a safe year that one could use as a guide where Hornby rolling stock and locomotives should be ok to run on code 75? I know I am looking at code 83 over here in the US but I should be use that as a guide for this question. I have Irish, British and American stock so it is whatever I am in a mood to run with. I will not part with any rolling stock as well before Murphy Models, I was getting some Hornby stock and I will not part with it. Even if i cannot run it on code 83 I am keeping the model and I am crazy enough to buy it again and keep the older one!!!

Hi MMIE353 Any models produced after 1995 should be ok. The main culprits are early Lima 1970s, 1980s and especially Tri-Ang Hornby stuff from the 70s and 80s. I have a childhood class 37 that won't even run over code 100 points.

Link to comment
Share on other sites

  • 0

Hi guys, got this reply from Peco, which may help myself & those who are encountering hiccups or whatever about Track, Flexi, Code 75, 100, Points etc. etc, 

BTB

“ Thank you for your emailThe large radius turnouts are already available, and are due to be followed by the single and double slips plus a long crossing in the next few months. After that we will be starting on medium radius turnouts with these likely to appear early next year. “ 

Link to comment
Share on other sites

  • 0
5 minutes ago, mmie353 said:

@murrayec is that also for Peco streamline? I know that set track is 67mm

It would all be the same, it's to do with stock hanging out over the rails on the bends and fouling a train doing the same thing on the other track, you may have some leeway with HO stock but if your going to be running OO Irish stick to above 65mm- at that dim Irish Cravens get pretty close! 

Eoin

  • Thanks 1
Link to comment
Share on other sites

  • 0

@mmie353just remember that Cravens were not the broadest stock to run on irish rails and some PRs and laminate stock (if ever produced) might be a scaled mm or two wider. The longer your stock, (Mk3s, 201s), the wider your stock, the tighter your curves, the greater the wobble when running (occasional cravens, uneven axle, imperfect handmade) the greater your chance of fouling and collision. The track can be a little closer on straights but must begin to diverge approaching a curve to ensure that minimum recommended as the curve starts. Long stock in particular will both overhang on the inside of the curve and the corner will project more from the outside of an inner curve relative to the wheel position

Link to comment
Share on other sites

  • 0
On 7/26/2020 at 5:37 PM, mmie353 said:

@DiveController thanks dude, I was looking at the Peco gauges and I am going to get them,..... I may stick with going 67mm between the rails. 

The gauges are usually back to back to measure the distance between the rails on one track. There are others but don't know that much about them. The 67mm rec is from between centers (or any given same point on both rails e.g inside of the R/H rail on track 1 to inside of R/H rail on track 2).

It might be easier for spacing to lay two parallel tracks with 67mm centers and then measure exactly the correct distance between the rails of adjacent tracks (less than 67 mm), or between the sleepers (less again). Then you can get some spacers to shove between the tracks as you lay them rather than keep trying to measure 67 between centers.

Other option is to mark one track center, then an adjacent line 67 away and stick your pins in but it get trickier if you want to put down cork or closed foam then you remark etc. Seems like spacers would be easier and if you get a mm or 2mm off laying the first track, your track separation is maintained

 

Edited by DiveController
  • Like 1
Link to comment
Share on other sites

  • 0
7 minutes ago, burnthebox said:

Hi guys again forgot to mention the Peco Streamline Code 100 as opposed to the Peco Code 75, is this in Streamline as well as the code 100..! What I’m trying to say is are these tracks the same except that the Code is different..! Hope I’m explaining this correctly..!  TIA

BTB

The selection of track seems identical. Code 75 is a smaller rail profile. Code 100 can inter operate with peco settrack.

 

Link to comment
Share on other sites

  • 0

Hi Noel & thanks again so now tell me if I go into the shop & ask for 1 box of Peco Code 75 Flexitrack Wooden sleeper is this  track Streamline..! or do I have to ask for that..! Sorry but I forgot to mention Bullhead, & by this I mean do code 75 & code 100 come as Bullhead,  Streamline, Flexitrack, Wooden sleeper,

Thanks 
Paul

Edited by burnthebox
Link to comment
Share on other sites

  • 0
6 hours ago, burnthebox said:

Hi Noel & thanks again so now tell me if I go into the shop & ask for 1 box of Peco Code 75 Flexitrack Wooden sleeper is this  track Streamline..! or do I have to ask for that..! Sorry but I forgot to mention Bullhead, & by this I mean do code 75 & code 100 come as Bullhead,  Streamline, Flexitrack, Wooden sleeper,

Thanks 
Paul

That’s what Peco call it ‘Peco Streamline Code 75 track‘ for the whole range

https://peco-uk.com/collections/streamline/75?page=2&view=12&layout=

 

Edited by Noel
Link to comment
Share on other sites

  • 0

Hi guys, & thanks Noel, now, I’m hoping to get Peco Code 75 Bullhead Flexitrack Wooden Sleeper. So finally I think..! Is this one ( 1 ) piece of track...!!!!! or am I talking about a number of pieces of track, & I’m planning for a OO GAUGE LAYOUT, TIA 

BTB

“ PECO STREAMLINE BULLHEAD WOODEN SLEEPER FLEXITRACK CODE 75 “ 

Link to comment
Share on other sites

  • 0

During the first national lockdown over here in the UK Peco shut down their production line for some period of time, although the likes of Railway Modeller was produced. Different kind of production line I guess. Strange that you could buy their products online but they weren’t actually making them.

Stephen

Link to comment
Share on other sites

  • -1

I want to also ask as I got the track gauges from Proses, I did not see the Peco one over here but is it correct to assume that 50mm is the distance that should be between the centers of both rails? Interesting to see that Peco have some catching up it seems with track production. 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Answer this question...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use