-
Posts
4,714 -
Joined
-
Last visited
-
Days Won
113
Content Type
Profiles
Forums
Resource Library
Events
Gallery
Blogs
Store
Community Map
Everything posted by Mayner
-
A remote control shunting loco recently fell into Harbour while shunting Picton freight yard. Picton is the South Island terminal of the train ferry that links New Zealands North and South Islands Rail system. The loco ran down the train ferry link span and fell into the harbour. The shunting locos use radio remote control that are controlled by a shunter (human) at the lineside.
-
I used a mixture of Peco Code 60 and Code 82 rail on a 21mm gauge layout I started about 10 years ago. I had the Code 60 in stock for a long term project, the Code 62 was salvaged from Atlas HO flexible track that was surplus after I sold my collection of O-16.5 American narrow gauge locos and stock. Resolution is not great. The loco and train are on a section of track laid with Code 60 rail to represent the lighter weight of rail often used in sidings and secondary running lines The trackwork on the left was laid in Code 82 rail to represent the heavier rail used on main running lines and sections of line carrying heavy traffic. I made the mistake of spacing the line on the left too close to the running line which lead to problems with coaches side swiping on curves, the double slip was a bit to ambitious for my tracklaying skills and I scrapped the layout. Looking the other way the difference in rail section between the track on the left and the other lines is more noticeable. The crossover is supposed to be part of the connection between a main running line and a small marshalling yard. Track was laid on foam rubber underlay copperclad sleepers, track was pre-fabricated on a bench, wire droppers fitted, painted with auto aerosol before laying in a bed of white glue on underlay, adjusting alignment and ballasting with Woodlands Scenics loose ballast before glue sets, vacuuming off surplus ballast. Some Irish companies principally DSER, GSWR, GNR, NCC and BCDR used chaired bullhead rail for main line trackage and running loops while using lighter flatbottom rail in sidings, branchlines and secondary main lines. Bull head track was retained on some lines until replaced with flatbottom CWR on concrete sleepers from the 1970s onwards, to confuse things slightly CIE, UTA and GNR used concrete sleepers with bullhead track from the 1950s onwards, concrete sleepered bull head track recovered from NIR is used on the Downpatrick Steam Railway. C&L finescale supply 4mm bullhead track components in including rail, chairs, sleepers. Flatbottom is more variable Peco Code 70 or Code 75 are probably the best options for general use possibly reserving Code 60 for sidings or narrow gauge. CIE tended to use a mixture of 84, 90 and 95lb yard flatbottom rail, 84lb rail installed during the 1920s was in use on the Mullingar-Sligo line until relaid with CWR track with a metric rail section about 20 years ago, the Mayo and Athlone Galway sections mainly 90lb. There is little visual difference between 84 & 90 lb FB rail just a slightly heavier section. 95lb FB has a wider foot 5 ½" which seems to correspond with Broithe's section possibly installed when 95lb FB. Possibly Code 70 for 84-90lb rails and Code 75 for 95lb rails Peco Code 60 for narrow gauge or lighter rail sections for little used sidings.
-
Something like a Parry People mover or contemporary or Hybrid version of the Drumm Battery Train with similar styling to the Dublin & Blessington Drewry railcar would provide a level of self sufficiency in terms of rolling stock, simple to maintain and operate, good for the eco credentials and attractive to families with young children who want a short train ride the railways bread and butter traffic. They might be able to obtain funding through some form of Gaeltacht Business Grant for a Parry People Mover or a new railcar, the primary purpose of the railway is to provide employment and promote tourism in the Gaeltacht and a railcar would support both objectives.
-
From 1st July all international parcels are required to have "an electronic customs declaration" which is generated in the Post Office or generated on a postal service on-line platform (retailers, traders and manufacturers. The declaration includes TIAC code value and other information. When a non-EU business like Hattons, Rails posts an order to Ireland details of the shipment and customs declaration are automatically transmitted by the Royal Mail to An Post before the package even leaves the UK. IOSS appears to be an intermediary or middle man to allow non-EU businesses pay vat on EU sales without having to register in every state.
-
I love it! Living abroad I miss the distinctive regional accents found in Ireland and the UK. Perhaps a case for phonetic script or even subtitles in the Larne and Dugort Harbour threads. I thought I understood most Irish accents until I met a couple of IE inspectors (possibly from Drogheda or Co Louth) while working near the line near Gormanstown and I could not understand a word they were saying!
-
Like the Chinese Engineers visiting a world-renowned factory (in Staffordshire) I got to see behind the scenes in all sorts of interesting places and to meet equally interesting people while working as a health and safety inspector in both Ireland and New Zealand. One of the more interesting was a heavy engineering works and former Locomotive builder continues to operate from its original 1868 premises complete with timber framed Foundry & Machine Shop. https://agprice.co.nz/our-company/ The business was originally established to produce mining machinery during a Gold Rush rush later became a major locomotive builder and continues to support the rail industry.
-
Certainly captures the spirit of the place with the sharp curve and overgrown siding I had planned to include Kiltubrid on the tramway section of the narrow gauge layout, I managed the sharp curve and bridge but the baseboard was too narrow to fit in the road, railway and Halt Keepers house. perhaps some day I will get round to building a new scenic section or mini layout incorporating Kiltubrid and Drumcong Post Office the two signature scenes on the Tramway. Currently I am thinking of a small OO9 layout to replace my N gauge American end-to end layout that has not progressed during the past year or two. I am thinking on a continuous run layout with a Welsh Narrow Gauge theme an excuse to buy a Bachmann WHR Baldwin 590 and Peco slate wagons and dispose of more of my American N gauge stock and locos.
-
The majority of Shapeways models are available in "Versatile Plastic" using FDM technology most likely because of cost. There tends to be a trade off between surface finish, strength and resilience with 3D printing technologies and materials. Versatile Plastic has the advantage of low cost strength and resilience with the disadvantage of a coarse surface texture and difficulty sanding. Fine Detail Plastic has the advantage of capturing fine detail against higher cost, visible layering and brittleness. Resin Printing is good at capturing fine detail with minimal layering against high cost (labour and material) and brittleness, requiring a high level of care in choice of resins for railway models. Shapeways have a SLA printing option (SLA Plastic) at 3-4 times the cost of versatile plastic. It might be worth contacting the designer for a quote for an SLA print of a simple coach or a wagon. I tend to agree with Andy that scratchbuilding or an etched kit would be a better option for a loco or coach than a Shapeways Versatile Plastic print.
-
CIE stopped using MK2D stock on the Enterprise after the train was de-railed as a result of an attack on the line near Lisburn in the mid 1970s. There is a photo of the de-railed train in an IRRS Journal from the period, coaches remained coupled and upright, I don't know if the de-railment was as a result of a hi-jacking or a bomb being detonated under the train. Conventional stock was also more operationally convenient for CIE as there seems to be enough Craven, Park Royals and Laminates to strengthen trains to meet seasonal demand while availability of MK2d stock was tight, the 1970s MK2D Enterprise seems to have typically loaded to 5-6 coaches including van. I prefer the original Maroon & Blue scheme since I first saw the train in Connolly station in 70/71 and later used to listen to and watch the evening North bound Enterprise climbing towards Killester from Collins Ave while waiting on the bus home from work for most of 78-79.
-
Avonlea Sun Loco service facility. CP Rail
Mayner replied to NIRCLASS80's topic in US / Canadian Railway Modelling
Interesting to see models of SOO ex-Milwaukee Road Bandits I came across an ex Milwaukee "Bandit" GP38-2 but did not realise what it was while visiting relative in North Dakota in 2004. While most of the through trains were hauled by relatively new GE power in the CP Beaver scheme, way freights were worked by locos in CP Pacman & SOO line branding. -
While Irish Rail were a lot more pro-active than CIE in terms of pursuing both passenger and freight traffic, the rail system became increasingly un-reliable and close to a state of collapse (breakdowns, derailments, extended journey times) as a result of the run down nature of the infrastructure during the 1990s. 1900-1914 is probably the closest to a "Golden Era" in terms of Irish Railways both in terms of sheer variety, standard of service and standard of maintenance of equipment and infrastructure. IE in the 90s and early 2000s is an ideal period for modelling a run down railway with weathered locos and stock and poorly maintained track, signalling and infrastructure The "Big Companies" (GSWR, GNR, BNCR (NCC) and MGWR) were prosperous even by UK standards, all introduced large modern locomotives and bogie stock with dining car service for main line services (all in distinctive liveries) during the early 1900s. IE was still attempting to run main line service on track laid by the GSWR,GNR & Midland 70-90 years later!
-
Arup to undertake all-Ireland rail review
Mayner replied to spudfan's topic in What's happening on the network?
It looks like a logical follow on from the "Irish Strategic Rail Review'' Booz Hamilton 2001 which marked a major change in Irish Government thinking which had previously focused on the losses made by CIE/IE rail services with no long term planning to retain and develop the existing rail network let alone develop new services. The future of rail in Ireland was in doubt during the 1990s with both the IE & NIR systems approaching the point of collapse, there was little Irish Government commitment to maintaining or developing rail services, overdue track renewals and improvements such as the Arrow & revived Enterprise were largely dependent on EU funding. The Irish Government had implemented a policy on no major investment in rail (with the exception of completing the Cork Line CTC and MK3 Intercity Coach projects) under the Building on Reality" programme of the 1980s, this policy was not finally reversed until the Government implemented some of the recommendations of the review which lead to the loosening of the purse strings and a shift to a Commuter and Intercity passenger railway with major investment in new rolling stock, infrastructure renewals which lead to more frequent train services. -
There are/were two Clonmacnoise & West Offaly "trains" coaches. The Blackwater Operation catered mainly for Coach Tours and added a second train (Coach) after several years successful operation. The project and Blackwater Museum was set up on the initiative of redundant BNM staff in the late 80s and seems to have been financially successful. the Tourist Train Operation was shut down after the new Shannon Bridge Power Station came on line and BNM fuel peat rail operations became extremely busy. I visited Blackwater in the early 90s both Tourist and Fuel Peat operations were busy with Milled Peat Trains queuing behind the 'passenger" line of sight operation. Interestingly Blackwater staff were proud of their operation and had visited several of the Welsh Narrow Gauge Lines while planning the West Offaly operation. By contrast I was the only passenger when I visited the Bellacorick railway and staff not exactly enthusiastic. The rolling stock at Bellacorick was more interesting from an enthusiasts perspective, the passenger portion of an ex-West Clare diesel railcar and a unique BNM rebuild of a RH diesel, but less attractive to the casual visitor or Coach Tour participant.
-
Definitely fits in the "Now for Something Completely Different" modelling category. The Lartigue loco looks really well in lined blue.
-
RTR wagons. We completed the decorated sample of 23544 & 23580 20T Brake Vans with post 1963 wheel logo for delivery Sep-Oct 2021. We are using waterslide (Railtec) transfers for these vans rather than pad printing used for our "Flying Snail' vans due to the relatively low numbers involved and challenges in forming the wasp stripes using pad printing. We are currently examining the option of dry print transfers as an alternative to waterslide for the Bulk Grain Wagon and other future models. Future models: Our designer is currently working on the original GSWR/GSR (planked)and early CIE (metal sheeted) versions of the standard covered H wagon. Loco and Coach Kits. The 52 Class Locomotive kits are sold out and have been shipped to customers. The parts are in stock and we expect to ship the Heating and Luggage, Luggage Van and Post Office/Tool Van kits to customers during September and October 2021. While the majority of these kits are pre-sold a number of these kits will be available for sale on the website.https://jmdesignmodelrailways.com/
-
The Nenagh Branch trains appear to have been the main 001 plus Craven passenger working in IE days, 001s were regularly used on Intercity diagrams with MK2D stock (Supertrain) on the Heuston-Waterford (early afternoon Heuston-Waterford and return) Connolly-Rosslare intercity trains and occasional CIE Enterprise working during the late 8os early 1990s. The Limerick-Ballybrophy was sometimes a 001 Class, Single Craven and BR van.
-
The 3 car BUT Railcar Set and 4w Hooded Van may be at Macmine Junction. There is a 1962 John Langford photo of a similar(possibly the same set) in the Waterford platform on what appears to be a southbound working with a Green 901 Class car leading, Cream and Blue ex-GNR Brake 3rd and Black and Tan 701 Class car trailing hauling what looks like a Black and Tan 4w PO van. There also appears to be a connecting train in the Waterford Platform in the H C A Beaumount photo Its possible the Railcars are exchanging Mail Traffic with a Wexford-Waterford passenger, during its final years most North Wexford passenger trains appear to have ran with 2 4w Hooded Vans and a single coach. The ex-GNR BK 3nd appears to have been re-built by NIR with new windows with rounded corners and new body paneling. Modern GNR flush sided stock were originally built with windows with square corners similar to the BUT and AEC railcars, this lead to problems with leaks and decayed (wooden) body framing especially on coaches built during WW11 which apparently had hardboard rather than steel body panels.
-
Vat is liable on the total value of a shipment including freight not just the declared value of the goods, international shipping is zero rated for GST so there is no element of double taxation. Hatton's probably claim the excess VAT as an expense when they reimburse a EU customer for vat charged by an Post on a tax paid item. Using a EU Intermediary or customs agent is likely to be prohibitively expensive for low value (<€150) shipments, one of the major international postal/express companies quoted a $40 DDTP processing fee for each package shipped to the EU regardless of value. Interestingly individual packages shipped using a DDTP service are delivered by Courier or Express companies rather than the Postal Service and shipped without a customs declaration or label on the box. We printed labels for test DDTP shipments to customers in the UK using NZ Posts on-line system, interestingly labels were domestic UK using a UK Courier Company rather than an international parcel label with customs declaration. I guess the main lesson is that modelers importing from outside of the EU can expect to pay higher prices for models including customs processing charges or limit their purchases to what's available in Irish model shops.
-
Unfortunately its not simply a matter of non-EU resident companies like Hattons registering for Irish/EU vat, paying the tax and putting a tax paid label on the box, they are also required to either have a physical presence in the EU or use an EU customs agent or intermediary. https://ec.europa.eu/taxation_customs/modernising-vat-cross-border-e-commerce_en JM Design registered for Irish vat & an EORI number in March in order to export tax and duty paid to Ireland and the EU. We currently export to the EU at 0%Vat as we could not guarantee that our customers would not be hit with VAT & admin charges at the point of entry. The Revenue Commissioners were unable to provide guidance on the declaration and clearance process and our preferred shipper is currently unable to offer a delivery duty and tax paid service to the EU despite announcing the service in January 2021. In practice it will probably be cheaper select shipment from the UK by a mail service and pay the vat on arrival than a Courier or Delivery Duty and Tax Paid service. An Post €3.50 service fee is cheap compared to customs clearance charges for individual DDTP packages.
-
The ex-BR "Vans" http://silverfoxmodels.co.uk/ir-ie-generating-steam-van-ex-br-mk1-bsk/ is probably the best option for a van for TL fitted Cravens. The "Dutch Vans" were less common (6) compared to the larger number (22) of ex-BR Vans The Cravens were used almost exclusively on main line Intercity services until some were "cascaded" onto Outer Suburban and Secondary Passenger services following the introduction of the MK3 Stock from 1983 onwards. Typical main line TL sets were usually made up of a "BR Van" "1951-53 Buffer Car and several Craven Coaches, TL fitted Park Royal & Laminate coaches were sometimes used to strengthen main line rakes.
-
Munster Simms appears to have been a fairly large oil distributor during the 1930s with both Belfast and Dublin registered wagon fleets. A number of photos of Irish registered tank wagons in the HMRSI Charles Roberts Collection. https://hmrs.org.uk/photographs/munster-simms-belfast-motor-spirit-14t-tank-no-2-order-942.html. https://hmrs.org.uk/photographs/munster-simms-dublin-14t-tank-wagon-no-4.html.
-
One of the challenges of building an Irish Broad Gauge steam locomotive in OO gauge! On the majority of outside cylinder steam locos the conrods are on the outside of the coupling rods but not on some outside cylinder 4-4-0 classes including the GNR Compounds and Metropolitan 4-4-0T. It basically leaves the builder with the choice of cranking the coupling rods to avoid running problems or fitting the conrods on the outside of the connecting rods and using a longer crank pin bush.
-
Nice to see the subtle weathering of the Tin Van it must be 5-6 years since they left the Carriage Shops in ex-works condition! The open un-cluttered nature of the place with no goods shed or station building reminds me of Fenit which I first visited in the summer of 78 several months after the last train (beet special)departed. Have lots of fun!
-
One of my favourite might have been scenarios was a "joint" MGWR-GNR line from Kells to Cavan via Virginia and possibly onwards to Enniskillen a better routing for Dublin-Cavan & possibly Monaghan passenger services than by Inny Junction. An amalgamation between the Midland and the Great Northern was actually considered in the early 1920s with the LMS taking over the lines north and west of Dublin and the GWR taking over the GSWR, DSER and West Cork.