Jump to content

Class 458 Build

Rate this topic


KMCE

Recommended Posts

As a break from the 495 build, I decided to start on another locomotive.

This will be my first foray into complete scratch building and have chosen the ex DSER No. 52;  4-4-2T, GSR Class 458, as a starting point.

This loco class was long lived (1893 - 1955) and provided good service on the DSER section but given its life, it could reasonably appear in a wide variety locations and with different demands.

 

156028680_458atGrandCanal.JPG.79a3ffcedef56dfc54628902ae514af6.JPG

Photo courtesy of the "Good Book" (Clements & Mc Mahon) 

 

I met with the good folk from the IRRS who were kind enough to give me access to the outline drawings which helped me develop up my own CAD drawings as an aid to building the loco.  What is interesting is that while the IRRS drawings are dimensioned, they are not to scale, so some tweaking was required to get a more accurate drawing to work from.

 

First thing need were the frames.  While it would be nice to create the frames in total (including the projection either side of the smokebox) it was easier to separate these into two sections.  Once they are put on the footplate & mounted on the frames, it will make little difference.

997628063_MainFrames.JPG.76c27034a11f0202a5ca914aa23fc10e.JPG

This template was printed out and checked for scale before cutting (yes there was an earlier attempt!) 

Two lengths of brass are tacked together, the template stuck down and cut with the piercing saw.

99324457_MainFramesBeingCut.thumb.png.32a431a394ce970dbae6204f30603aeb.png

The result of much cutting and tidying up with files to get to this point.

 

I decided to compensate this chassis and am following the very good directions provided in Flexichas (Mike Sharman) who outlines the various methods of providing a fully compensated chassis.

 

In this instance, a primary compensation unit is constructed with fixed bearings able to pivot around a forward fulcrum, and balanced by the rear trailing wheels.  What's nice about this is it's in the location of the firebox so seves two functions.

This unit was developed around the chassis drawing and was cut in a similar fashion to the main frames.

697482146_MainCompensationUnit.thumb.png.13d30df977d46054a149f3c697cfd39e.png

A few rivets along the bottom will provide the illusion of the firebox.  This was then assembled to give:

Main_Compensation_Unit_Built.thumb.png.e2755bcdf602d4bff5e7384d912e6c0f.png

 

This was inserted into the frames, the unit loaded into the locobox to set the hornblocks for the front driving axle.  Lots of pegs etc were needed to get the frame and compensated unit to sit correctly before fixing in the hornblocks.  8'-6" coupling rods were used to set the distance and hornblocks soldered in.

20180715_211058.thumb.jpg.00f9776e244f46b920e24c9023bc5ddb.jpg

From this starting point it was possible to set the trailing wheels and their respective hornblocks.  

Some wheels were installed to get some idea of how the rear compensating unit will operate.  At present a 1.5mm rod is located in the rear of the main compensating unit, which will pivot around the cross bar(?) which will then bear down on the trailing wheel axle.  A vertical structure will be needed to make up the difference in height between these two units.  Ride height can then be adjusted by tweaking the bar until the unit sits at the right height.

The main compensation unit will also provide a good location for the gearbox and motor which can be fixed to this unit.

 

Sub-Assembly1.thumb.png.661cf1f2f3c1b79ff06997e7433cfec9.png

 

Humble beginings, but a thoroughly enjoyable learning curve and looking forward to see how this turns out.

 

A good source of information, and inspiration, is "Scratch-Building Model Railway Tank Locomotives" by Simon Bolton.  Excellent read, even if you are not going to build your own locomotive - he takes away the mystery (and fear) of scratch building and is certainly influencing me here.

 

More soon.

 

Regards,

 

Ken

  • Like 4
  • WOW! 1
Link to comment
Share on other sites

Excellent work Ken

Best way to do projects, all together! each process assists in each project, and repetition makes the work better...

I have Mr Bolton's book on building 0-6-0 J15 (British), excellent info. The tank loco one is on my to get list

Eoin

  • Like 2
Link to comment
Share on other sites

That’s a superb prototype - might it find a home for your spare motor?

There seems a growing interest in GSR locos now - not before time, as they were the largest company in Ireland by an extremely long way, and had an almost unlimited array of stock - a modeller’s lifetime dream.

I look forward to seeing progress.

 

  • Like 3
Link to comment
Share on other sites

Little bit of work last night.

Built the compensation bar between the sub frame and the rear axle.  Tricky little bugger to put together - all parts are very close & soldering led to things moving around enough to cause me to revert to my collection of expletives!

20180718_201659.thumb.jpg.b94563cff88df825dbb640f8bb46e5ce.jpg

20180718_213228.thumb.jpg.2562bdb80c2f8b0f5637cdfe2b2d16b9.jpg

Simple in theory, but tricky to execute.

 

How it operates

20180718_213719.thumb.jpg.b169637623c6f7870ded23a00bb166d2.jpg

20180718_213820.thumb.jpg.3a6d3f9be1527a3b53e4a0c2329a23ca.jpg

Once the bogey and front driver are installed, this compensation unit will set the height for the rear axles and let them move around depending on track conditions.  the range of articulation can be seen from the two photos.  Just to put this in scale - the distance between the frames is about 17mm.

 

Working on the bogey at the moment and will post some photos on progress shortly.

Regards,

Ken

  • Like 4
Link to comment
Share on other sites

  • 2 weeks later...

Made some good progress over the weekend

Bogie frames were cut out, frame spacer and mini hornblocks installed.  Soldering work really needs more practice  😉

425986647_BogieFrames.jpg.cd7e6bf59f2381e23736b67c235d8b9b.jpg

 

A compensation bar was installed through some box to control axle movement and add some height for connection to the main chassis.

1042959081_BogiewithCompensation.thumb.jpg.505932fb4fc302fda5b85ff1fef62344.jpg

 

A compensation unit was constructed for the forward chassis which would provide equalisation between the bogie and front driver.

1025379911_FrontCompensationUnit.thumb.jpg.9eb18134808c76df169c165bc196a191.jpg

 

When all assembled, we get to a basic rolling chassis which is now running at the correct height.  Some minor fettling may be required once the body is on, if there is any forward or rearward leaning.

458099221_BasicRollingChassis.thumb.jpg.1ea11468a05841128026c3cab51aab97.jpg

 

Gearbox was next.  High Level Roadrunner+ to allow some movement and articulation if needed.  May be over the top, but we'll see as we go along.

339443216_GearboxEtch.thumb.jpg.881530e13d299f3e60167c541239db94.jpg

Bearings soldered into the etch, parts folded and gearbox assembled to arrive at...

1024314872_GearboxComplete.thumb.jpg.fb473824716030481deb887bf27c7aea.jpg

 

Crankpins (Alan Gibson) were installed in the main drivers and a set of coupling rods were constructed, again from an Alan Gibson etch.  Coupling rods appear to be my kryptonite though; opening out the holes for the crankpins with broaches inevitably leads to slight twisting of the coupling rod at its weakest point.  It takes some amount of work to get them straight and level to allow soldering to the corresponding etch.  Need to work on that!!

 

But when all that is done, we finally get to a rolling chassis.

619367412_RollingChassis.thumb.jpg.fbe6774f9f494610e9e095513faf6beb.jpg

 

Well, almost!!

Few things to adjust.  Quartering on the wheels is not 100% and there is a very slight bind that needs adjusting.  The bearing pad on the front compensation unit is too far forward and is putting weight on the leading bogie wheels rather than the bogie itself which will need to be adjusted.  Coupling rods need a good tidying up with the file to get them looking semi-normal.  Once I'm happy with the compensation, the pins need to be cut back and soldered to fix them in position.

 

So now, a fully compensated chassis with movement on all axles.  Excellent, except its like an octopus trying to get it onto the tracks; everything moves, so its necessary to set each axle on the track, one by one, however, when it is on the track, the movement is something to behold - it just ripples over any imperfection in the track.

Next up - electrical pickups, temporary fixing for the gearbox, motor install and a test run.  🙂 

 

More later

 

Ken

  • Like 3
  • WOW! 3
Link to comment
Share on other sites

  • 2 weeks later...

Progress to date.

 

Bearing pad for bogie has been trimmed back to rest on the centre of the bogie which now applies equal pressure to the wheel sets.

 

Simple "wiper" pickups were added by using copper clad and some phosphor bronze wire.   The copper clad is fixed to the subframe, so the contact withe the rear drivers is assured, while contact on the front drivers will depend on track conditions.  If the front drivers flex, they may loose contact with the pickup;  there is a fine balance here between maintaining contact and excessive spring force from the phosphor bronze.

1055212458_Chassiswithmotor.thumb.jpg.b4ab51f8f6e253d992accb39daf2bc20.jpg

 

Depending on how the chassis performs, I may put pickups on the trailing wheel, but so far, so good.

 

Motor was wired up and put on the test track to see how it performs.  

 

1246815555_MotorisedChassis.thumb.jpg.fb4c44078bc3ad8c2511ba105c60f457.jpg

The string is to hold the motor from moving under torque which can be fine tuned later with some cable ties.

And behold a running chassis - Eh, No.

 

Much, and I mean much, fettling later with axle bearings and coupling rod holes we have a running chassis.  Slow speed could be a little better, so more fettling may be required to just iron out those very minor sticky points.

 

Other than that, we have a fully motorised and compensated chassis.  It does need weight to let it run smoothly as the weight is distributed over all axles and not just the drivers, but that can be sorted once the body is constructed and the whole unit run as one.

 

Very happy with progress so far.  Onwards and upwards!!

 

Ken

  • Like 4
Link to comment
Share on other sites

  • 4 weeks later...

Got some more work done this weekend.

 

Starting on the body.  So, footplate first.   Basic shape cut out and internal shape cut using piercing saw. 

This tool can definitely be said to operate on the Ouija Board principle -  It transforms human energy into a crooked, unpredictable motion, and the more you attempt to influence its course, the more dismal your future becomes.

 

1723618431_FootplateCut.thumb.jpg.021564b6254ff6ae47a56474981cbbfd.jpg

As wavy as those lines look, this is not a bad effort in my books.  Anyway, this all gets cleaned up with files and squares to make sure all is straight.

 

Once this is done, buffer beams and valances are needed.  Front buffer beam installed, followed by the valances, which in this case are 1mm x 1mm angle. 

1848029404_Footplate-1Side.thumb.jpg.6757d29b5fe138b69c26b70ccbd43e4f.jpg

 

This both provides the visual valance, but also provides considerable strength;  a little bit of tweaking to get in all flat, and we arrive at:

540979383_FootplateComplete1.thumb.jpg.90c9c7ce953bd47bb3053cf03c87af6b.jpg

 

All good so far.  Now to try on the chassis.

93585823_FootplateComplete2.thumb.jpg.b23117bac5b0d62a96caa6eaa3a23de0.jpg

 

Without the body, there appears to be a lot of overhang from the wheels to the sides of the foot plate, but a quick check back to the drawings to confirm that it is just over 9 feet (scale) wide.  I never really noticed the difference between the inside line of the rail and the outside of the frame, but in this instance is the best part of 2 feet.  

Head on, it looks a little better, but once the body is filling out the shape, it should look better. (Straighter camera angle would also help!!)

1665267357_FootplateComplete3.thumb.jpg.5ab51b7fbd7de74d92ffc70867b0cfcf.jpg

 

Sheets dimensions and tacked together to start work on the cab front & rear as well as sides.  

More, as time permits,

 

Ken

  • Like 8
Link to comment
Share on other sites

Getting a run at this.

 

Cab sides were marked and cut out - the P-slot for cab door and window was quite challenging, and needs a little more tidying up.

703149068_TankSidesCutOut.thumb.jpg.b067561394493a3043149e80ab0870d6.jpg

 

Cab Front and rear were also marked and cut out.  Drilling out of the windows caused some burr issues which needed to be filed down, however this then scratched the surface, so some flat sanding with wet and dry will be needed.

1950568315_CabFrontRear.thumb.jpg.7dfb2339dafd18f958c170ec25a68a33.jpg

Can anyone spot the little / big mistake..............Hmm............Looks like the cutout to clear the motor is a little too wide at the shoulders and probably will not be covered by the boiler & tanks.  It needed to be the width and height to clear pick ups and motor respectively, but perhaps a more triangular shape would have been better.

I may need to get everything into place before soldering in the cab front just to see how much tidying up is needed.  I can always add filler pieces with solder and sand to a smooth finish.

 

Anyway....

When all are cut out and filed, we get the following parts almost ready for assembly.

1173239855_TankCabParts.thumb.jpg.ad2b3473f8d3f4a7f63f6f4bd75701e2.jpg

Some sanding carried out on the cab front and rear, but more needed..  The sides will need more fettling and cleaning up before i put them together but it's progressing well.

 

While working on the footplate the other day, I also made up the forms for the smoke box.  These will be spaced with bolts and some scrap brass initially until the wrapper is added.  Bolts can then be removed leaving a nice smoke box (well hopefully anyway)

1125105477_SmokeBoxFormers.jpg.a1156fba2516ca4c1a0396f3fb657239.jpg

 

That's all for now.

 

Ken

 

  • Like 5
Link to comment
Share on other sites

Build progressing nicely.

 

Got out the rivet punch once all sides were properly shaped.  Rivets added in a similar fashion to the prototype, but not exactly (just in case any rivet counters want to take me to task).   I'm more in the 'effect' rather than 'exact' camp.

381872752_TankSidesPreformed.thumb.jpg.54f18ce04d64755f067a55d089340b04.jpg

I kept the front of the tank as part of the side and bent in once the rivets were added.  It was over long, and then trimmed to the dimension once the boiler tube was offered up.  There may be some final tweaking needed, but seems to fit quite well at the moment.

Out with the soldering iron and bunker rear in first on one side followed by the cab back; other side was then fixed in place.  I'm keeping the cab front loose for the moment so I can fix that little error once the boiler is in place.

 

All assembled including tank tops we get to this:

64828260_BodyAssembled.thumb.jpg.16f6209512336d2daec42d89f5756d66.jpg1388393115_BodyAssembled1.thumb.jpg.bb37c0275b57ad989485a6c09ecd5426.jpg

Bunker tank sides and tops need to be fabricated and installed next - line of rivets on the bunker back have been pressed and can be seen on the photo above.

Spectacles on the windows were created from thin cuts of 6mm brass tube filed and sanded until smooth and thin.  Bit tricky getting them all the same size - I think the are all pretty much equal - 'ish'.

 

Body was then dry fitted to the footplate for fit.

 

837590563_BodyonFootplate.thumb.jpg.2ba0d7093af78cc6004c78b25699bf1f.jpg

 

And then onto the chassis to get a look at how it's all coming together2139972487_BodyonChassis.thumb.jpg.08d250ce99b57dc7665becee4bb2a425.jpg1001550898_BodyonChassis1.thumb.jpg.fba77dd20f4ed69ae8d6e64523713a5f.jpg

 

A head on view with the body on.  Proportions are starting to look a little better - improved camera angle no doubt helping!

2094821679_BodyonChassis2.thumb.jpg.b0df07e1ae2e024f4865a539f4b167b0.jpg

That little error with the cab front is a little more evident in this photo, hence - keep it loose for the moment until I know what repair is needed.

 

 

All for now - till the next time.

Ken

  • Like 4
  • WOW! 2
Link to comment
Share on other sites

Ken 

Very impressive, a nice example of the scratchbuilders art.

Could you expand a bit more on your techniques for cutting the external shape & straight lines and the use of the rivet press?

Some modelers use a snips for external cuts and file to the finished line others use a razor saw or metal shear.

Did you use a rivet press with an indexing table or rely on an eagle eye and steady hand while punching the rivets?

  • Like 1
Link to comment
Share on other sites

Hello John,

 

Thanks for your comments - much appreciated.

As to the questions:

For cutting straight lines the following are used depending on material & what's involved

  • Cutting blanks out of the base sheet is with a heavy steel rule and a stanley knife.  The sheet is scored multiple times until a faint line is seen on the other side.  The piece to be cut off is clamped in a large vice & remaining sheet is bent back and forward to break the joint.  The burr created by this needs to be cleaned up with a file.   
  • This method is also used  to cut straight lines on single sheet smaller pieces, but using a hold and fold tool to clamp the piece.
  • For patterns (tank sides for example), two sheets are lined up and tacked together with solder.  I then either mark using a dividers, or if a complex pattern, using a printed template glued on with pritt stick or similar.  The scribe mark is better as the metal has a more permanent mark - the paper template has a tendency to get shredded in the cutting an filing process, so lines are not so clear.
  • Straight lines on twin sheets are cut using the piercing saw and then cleaned with the files to get a straight line.  The key I have found is to leave enough slack to ensure you don't cross the line, but not too much so you have a load of filing to do.
  • The book I mentioned before recommends the finest of blades for the piercing saw, however I soon got fed up of breaking and replacing blades, so I went for a slightly larger blade, which tracks straighter and is not so brittle.

205614443_PiercingSawFiles.thumb.jpg.f3e3bea05183b56ba69e1f385e328e1a.jpg

 

For the rivets I use the Kettering Press which can be bought with different sizes of hammer & anvil for different scales.  I got the 0.4mm (OO) and the 0.7mm (O) and use both on the model, as there are clearly larger and smaller rivets on the prototype.

I had to make a base, platform and sliding table to hold the work while I press it, as it would be almost impossible to hold small pieces steady enough to get a a reasonable line.  the sliding top has a dovetail groove on the underside with two screws fixed in the base below, so slides on the groove without too much lateral movement.

1844660901_RivetPunch.thumb.jpg.06dbb28a86ee8f1f348e06efdb333b0b.jpg

 

The table and base are just made up from scrap timber from the workshop so are not pretty - "form follows function" and all that.

To get the straight lines, there is a backstop which helps to keep the rivets in line, and obviously can be set for different depths depending on what you are trying to do.

As for the even line, what I found is that when a rivet is punched, the collar on the anvil, acts like a stop (or spacer) and provides a clean evenly space line of rivets.  I have found it is not possible to get a tighter set out as the material will not sit properly on the anvil to stamp closer.  Wider spacing would need some marks on the material, as there is no indexing facility with this tool 812821161_RivetPunch1.thumb.jpg.7ee53e54606c4018360045a22a1fbccc.jpg

      Hope that hasn't been too long-winded  an answer to the questions and helps.

 

Regrads,

 

Ken

 

  • Like 2
  • Informative 1
Link to comment
Share on other sites

Finally, some round stuff.  Got to work on the boiler and smoke box this evening.

 

A spacer was fabricated from some scrap for inserting between the smoke box formers.  The captive nut is to allow connection of the boiler and smoke box.

328648020_SmokeBoxSpacer.thumb.jpg.dd6d5c53bc7a3926474d89bde09e381c.jpg

 

Wrapper was fabricated from some 0.3 mm brass and rivets added for detail.  It was rolled using tube on the thigh - quite uncomfortable after time, so a general shape was developed and then tacked to the formers.812051501_SmokeBoxWrapper.thumb.jpg.c8564cb80edeb88c30c1ea674b96c99f.jpg

 

The reverse curve was generated using a tube pressing against the former and then the wrapper was finally soldered in place.   The excess front and rear was ground / sanded away to leave a smooth face front and rear.

1039721685_SmokeBoxWrapperComplete.thumb.jpg.258b696f7a3e955463926261a306e59f.jpg 

 

Boiler barrel was formed from some brass tube and an insert with captive bolt was created using threaded rod and a nut. 

324728626_BoilerBarrelInsert.thumb.jpg.b4a5362b31aaa6e508b2b4d43b598069.jpg

 

The threaded rod will thread into the captive nut in the smoke box.  Once the boiler barrel was tightly connected to the smoke box, it was time to mark and cut away a section of the barrel where the motor is located.  This cut was initially a little short, and was catching the spare end of the motor shaft, and rather than cut back to this point, I elected to cut a slot to clear the motor shaft.  I may adjust this later if there is a need to fit a fly wheel on the motor shaft.

2020634388_BoilerBarrelShaped.thumb.jpg.34758687ec6585c35632e5857b5e6d5f.jpg

This work takes time as the boiler barrel absorbs quite a bit of heat and it takes much longer than normal to get some proper soldered joints.  I needed to up the soldering iron to 400 C to make any reasonable progress.

 

Next thing was to mate the boiler / smoke box to the cab front.  The threaded rod soldered to the inside top of the boiler should line up with a hole in the cab front. 

Yeah, right! 

The hole / threaded rod combination were about 1mm too far to one side, so the hole needed to be elongated to get the correct fit.  Took a bit of fettling, but it's more or less in the correct position now.  It's not a big issue, as the nut is inside the cab and will not visible.

500539903_BoilerBarrelCabFront.thumb.jpg.2322020e472b226910889e02c0a64b8d.jpg

 

Finally, try it together with the work already complete, et voila!

1967432839_BoilerBarrelLoco.thumb.jpg.a645a9029d3e1716950cde6f1a0d04e5.jpg

Now it's starting to look like a locomotive!!

 

More soon.

  • Like 5
  • WOW! 3
Link to comment
Share on other sites

On 7/18/2018 at 1:20 PM, jhb171achill said:

There seems a growing interest in GSR locos now - not before time, as they were the largest company in Ireland by an extremely long way, and had an almost unlimited array of stock - a modeller’s lifetime dream.

I really believe that exposure (or lack thereof) is, in part at least, responsible for the (apparent) lack of interest in irish steam. This may be because the irish modelling community is smaller than in GB. On the larger island in addition to greater degree of preservation of the prototype, there is still  a lot of rtr stock available to run at exhibitions and to be seen on the shelf for purchase.

Ken, that's a very impressive model indeed. Look forward to seeing her running.

  • Like 1
Link to comment
Share on other sites

On 7/19/2018 at 6:20 AM, jhb171achill said:

That’s a superb prototype - might it find a home for your spare motor?

There seems a growing interest in GSR locos now - not before time, as they were the largest company in Ireland by an extremely long way, and had an almost unlimited array of stock - a modeller’s lifetime dream.

I look forward to seeing progress.

 

The hobby has changed a lot in the last 20 years with a noticeable shift away from kit and scratchbuilding to rtr, the other factor is that the majority of people who model the railways of their childhood/formative years and there are relatively few people with memories of steam in regular operation on the CIE system or interest in the CIE black and tan era. I managed to convince myself that I saw a large blue steam locomotive with smoke deflectors leading an express across Gormanstown Viaduct on a childhood trip to the sea side in 63 or 64. Years later I learned that CIE sold Vs 207 to the UTA who used her on weekend Belfast-Dublin "Tourist Train"

The other factor that has crept in is that a scratch or kit built model is somehow going to be far inferior to a ready to run model and a growing proportion of people are prepared to wait in the hope that Murphy Models or Irish Railway Models will bring out a model or their favourite loco or piece of rolling stock than assemble a kit or attempt a scratchbuild.

Steam is easier to to scratchbuild than more modern power, basically rectangles and circles rather than compound curves.

Hopefully Ken's excellent thread will encourage people to have a go at scratchbuilding or kit assembly

  • Like 5
Link to comment
Share on other sites

I think a lack of exposure is certainly evident. Perhaps, with such a bewildering array of locos, differing uses, and differing routes, confusion puts some people off.... but nowhere better for an Irish model layout than any station on the South Kerry, Mallow - Waterford, or the ex- W & L lines (Limerick to Tralee, Sligo & Waterford). A prototype of Cashel, or a station on the Thurles-Clonmel line would make nice layouts.

  • Like 2
Link to comment
Share on other sites

I’ll try to put together a rough guide to what could be mostly expected to be seen in most places. With so many classes of loco having but one or two examples, the exceptions will far outweigh the norm, however few of us will have an example if every GSR loco in our possession.

Obviously, the J15 being by FAR the most common loco, was in many ways the 141 of the past. Few West Cork locos ever left their area at all, even as one-offs, though of course one of the famous “Bandon Tanks” ended up on the DSE suburban. The J15’s and their neighbours, the MGWR J18s, tended to stick to their respective areas, though J15s were very common on Tralee - Limerick - Sligo after the W & L came into the GSWR fold.

Most ex-Midland branchlines had J18s or G2 2.4.0s from opening to closure or dieselisation. Most ex-GSWR & WLWR branches ended up with J15s; many having them start to finish.

Michael McMahon’s GSR loco “bible” fills in the many, many blanks and exceptions, describing the operational habits of the lesser classes.

Certainly, just as any layout based on UTA simply can’t be realistic without a UG or a Jeep, anything NIR must have an 80-class or three, and CIE / IE from 1963 to 2000 simply won’t cut the mustard without at least one 141, nothing CIE 1945-63 looks right without a grubby J15.

The forthcoming “Dugort Harbour”, despite being just a small shunting terminus, will have three J15s and three 141s.....plus a few Cs, as befits many branch termini on CIE between 1955 and 1963.

  • Like 1
  • Thanks 1
  • Informative 1
Link to comment
Share on other sites

Recent progress - Quite a bit of work, but not much to show compared to before.

 

Boiler, body, footplate and chassis are now fixed.  Done in a way to ensure it can can come apart for painting and maintenance.

Tab installed at the front and screw through to the bunker holds the chassis.  A fixing plate and captive nut was soldered to the base of the smokebox with a bold through the footplate holds the boiler in place at one end, with a nut through the cab front holds the other end.

826225998_RearFixing.thumb.jpg.d91038261d0c3326c4f5cc5ffb0a0a91.jpg1442158386_FrontTab.thumb.jpg.d73f4323c9244ebcd01a295c763620bf.jpg

A nut was soldered to the inside front face of the tanks which allows bolts thread thorough from the footplate to hold the tanks down.

All good and secure now.

 

Cab front has been soldered onto the cabsides, and the gaps filled to provide a smooth face.  Some last tiding up around the opening for the boiler holding bolt will be needed now that all is in its final locations.

1143616671_FrontValveCovverPlate.thumb.jpg.6e9dca9a26e81592b0dfb0b81a58bb67.jpg

The front upper frames were made and fixed down either side of the smoke box which finishes the footplate off nicely.  The prototypes had a plate with grab handle on it which covers the front of the valves and this was soldered into place.  These few items, while taking up most of the evening are starting to finish off the model nicely.

 

So the big question - with the extra weight does it run well.  Eh - no, not yet.

The weight is transmitted down through the compensation pivot points, but is bearing more on the bogie and trailing wheels, so a little fettling is required to settle the drivers firmly on the track.  But we are getting there. 

Still need to do the bunker tanks, and put in some false tank ends inside the cab.  A roof would be nice, so we still have more work to do.

 

More shortly.

Ken

  • Like 4
  • WOW! 2
Link to comment
Share on other sites

  • 3 weeks later...

Some more work.

 

Roof was shaped from some brass sheet and rolled into a rough form - this needed fettling to fit the cab curves.  Cab sides also needed some fettling to allow roof to sit down properly. Roof is held in place with PB wire tabs - it provides a friction fit so it can be removed if necessary.  

1173137228_RoofUnderside.thumb.jpg.0b3b9b9aba35c70be740d1407eadcb82.jpg

I'm still debating this - is access really needed when the whole locomotive comes apart quite easily?  It is a little difficult to get the roof to sit tightly.

Sides were bent up slightly using the folding tool and a line of rivets added front and back.

 

Next up was the interconnector between main and bunker tanks.   This is under the footplate and behind the cab steps.  Basic construction of which was fixed to the underside of the footplate leaving room for the steps later.

1228395807_TankConnections.thumb.jpg.ca241eba53d692b39d080e1516fd534f.jpg

 

So tank connectors and roof on, we get this.

350540417_RoofOn.thumb.jpg.27968239718d7e8b11f86cd8d699b106.jpg

 

I had a smoke stack and dome from another kit which were close to the prototype, so added these.  Not entirely happy with the location of the dome - it is a little too far forward when viewed from the side.  The safety valve bonnet has not been added yet which may help to reduce that long run of boiler behind the dome.  We can deal with that later.

 

One element recommended in the book "Scratch-Building Model Railway Tank Locomotives" by Simon Bolton is the use of half round brass wire to provide finishing details.  It's a good idea and looks well in the book.  He comments that he would be lost without his half round brass wire.....hmm...I think I'm lost with it!!

In principle it is quite a straight forward operation - tin the seam and back of the wire and sweat the two together.  In practice, it's a little more difficult to get the lines straight and corners crisp.  First attempt on the LHS tank will need to be redone as it is all over the place - later work on the RHS tank, cab openings and bunker are a little better and do help to soften the edges.  All part of the learning curve as they say.........

However, we are starting to get a smart looking locomotive (even if I do say so myself!)

1356595896_BrassWireOn.thumb.jpg.61d05c84219471ea8cfdabe7d08be08d.jpg

More soon.

Ken

  • Like 4
  • WOW! 2
Link to comment
Share on other sites

How did I miss this??

One reason is that I assumed that Class 458 referred to some sort of modern DMU. Also, it's not in the Workbench section ('wags finger').

Superb work; way above my pay grade but it is comforting to know that there are people modelling Irish railways to such a high standard.

Thanks for sharing it with us.

Regards,

Glover

  • Like 3
  • Funny 1
Link to comment
Share on other sites

  • 2 weeks later...

Brake time!

 

Well after the break, there was some work done.  I had drilled the chassis to take brake hangers and blocks but needed rods underneath.

Brake hangars & blocks were machined out of 0.5mm brass- I'm moving into the CNC realm at the moment, so this was good test.  Parts machined well and cut out of tabs to ensure they did not go flying on the CNC (earlier attempt did not go so well!)  Parts needed tabs trimmed off and filed back to complete; hence shoes are not identical.

Shoes were then soldered to the hangars before fitting to the loco.

1279087168_BrakeBlocks.thumb.jpg.eb70419adb80b76b7385dc4e6833bfac.jpg

 

Brake rods were cut from some 0.3mm Nickel Silver and holes drilled accordingly.  Spacing is not 100% as the rear brake blocks are too far from the wheel for my liking, so that will need a tweak to get it more realistic.

Front and rear brakes were attached using 1mm tube through the pre prepared holes.  The bottom holes also picked up some 1mm tube to connect through the rods.

1798822900_ChassiswithBrakes.thumb.jpg.e867d58724aefc1d6171124a6f121270.jpg

 

The ends of the rods at the cab end needed to be fixed and were fitted with some faux actuating levers which were angled and fixed back to the frames.  This secures the rods at three point and holds everything quite rigid given the sizes of the pieces.  Rather fiddly to execute, but came together nicely.

I added in a faux joint using some of the rod strip with some rivets on it for detail, which turned out surprisingly well.

Once the chassis was back together, we get this:

179656019_LocowithBrakes.thumb.jpg.051ac3d98edacf0538edb7a3fb272033.jpg

Those rear brakes are just a little too far forward.   I have two options - fix it, or leave it, as the front steps obscure the view of the front hangars and block, so perhaps it will not be as noticible.   Probably better to fix it and it will be right going forward.

 

The 1.5mm tubes which hold the compensation bars (see above) were trimmed back to the chassis and soldered into place which really tidies up the look of the chassis and stops things from falling apart.

A view of the completed work from below look like this:

 

2076784630_BrakesComplete.thumb.jpg.b52c4ca983328428b7391d1adac68a19.jpg

Edging closer to completion 🙂

  • Like 6
  • WOW! 1
Link to comment
Share on other sites

I'm posting this message in several places where relevant; Roderick of 00 Works informs me that Precision Paints now have the correct loco grey.

They ALREADY have "loco grey"; I assume this is the lighter shade used today on 071s. So the correct one to ask for is "GSWR / GSR / CIE Locomotive Grey", mouthful though that is....

This model has got to be one of the best scratchbuilds I've ever seen. Very well done!

  • Like 2
  • Thanks 1
Link to comment
Share on other sites

  • 1 year later...

Wow, just looked at the date of my last post on this one - neraly two years ago.

 

Well, its been sitting on the shelf looking at me, so I decided I would make a concerted effort to get it finished.

In fairness, the loco was broadly complete and just needed some finishing details.  Got around to over the last few days and a few quick photos before it goes to paint.

639872458_458-FrontQuarterComplete.thumb.jpg.e2eb6732c8286e4698bc75c54c9d28db.jpg

1865263604_458-AboveComplete.thumb.jpg.dad20b863ba819e0ca841b129387e8c9.jpg

885034576_458-RearQuarterComplete2.thumb.jpg.0db73c97568cb97fab57af86a35357bf.jpg

112004337_458-RearQuarterComplete1.thumb.jpg.b1aab536ef1f418f517cfb78ecb3729d.jpg

Now begins the painting & fettling,, and hopefully I will have it with me on Sunday in Bray.

Ken

  • Like 8
  • WOW! 6
Link to comment
Share on other sites

3 hours ago, KMCE said:

Thanks for the comments guys - much appreciated.

Colin it is 4mm - I haven't graduated to 7mm yet.

Ken

All I can say is WOW in 7mm it is impressive but 4mm well that takes it to the next level, I don't think i have the patients to do what you do.

5 star stuff

Regards

Colin R

 

  • Thanks 1
Link to comment
Share on other sites

Just started reading this and was wondering why I hadn't seen it before, then noticed the dates...

 Also, a reminder to self that need to pay more attention to the Irish Models thread, as I tend to focus on Layouts and Workshop. Anyway...

 ... what a fine project and fantastic model you have here, Ken. Not just great work, but a clear understanding of what are, to me, the dark arts of compensation. Wouldn't know what scale it was from the photos - proof of the quality of your workmanship.

 Just wonderful.

  • Like 1
  • Thanks 1
Link to comment
Share on other sites

Once again, many thanks for the kind remarks - they are much appreciated.

11 hours ago, murrayec said:

I hope you bring it along to the Fair on Sunday so we can get a good look?

Yes, I will bring it along, however it will be in brass as there is not enough time to paint it before Sunday.

 

1 hour ago, David Holman said:

the dark arts of compensation.

I have to give credit to the excellent book by Mike Sharman - Flexichas for that work.  He breaks down the principles and concepts into easily understood mechanics.  The tricky bit is getting the weight distribution and height right; I will need to add more weight to the body to help adhesion. 

The other thing I need to make is a railer, because these are a bugger to get on the track with all wheels articulating.

 

Anyway - hope to see people on Sunday at the fair.

Ken

  • Like 3
  • Informative 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use