Jump to content

Darius’ Workbench

Rate this topic


Recommended Posts

Posted

Spoils look really good , bending handrails is a labour of love and yours do look good. I fitted a false floor and glued in Woodland senics mid talus and some coarse "4mm"  ballast - boulders! I had to hand. IIRC  I added  10 g wheel weight underneath as well. 

The transfers fit well your design works well,  Hopefully when the jeep arrives from IRM then these wonderfully esoteric wagons would be a must for an RTR cash sink hole!    

Robert   

  • Like 4
Posted

Hi Robert,

A couple of Jeeps (at least) would be heading my way once someone (IRM hint hint) decides to produce rtr versions.

I have just received some more Double Beet and Spoil Wagon kits from Leslie so these should keep me busy over the next few weeks.

Cheers

Darius

  • Like 3
  • Funny 1
Posted (edited)

Great stuff, Darius.

Now what are you going to load them with? Does anyone do "4mm Genuine Maghermorne rock"?

Keep it up, you're my best salesman!

Your order brought the Spoils in circulation to 220 (three times the number produced in reality!).

Your beets brought up 242 sold -  the quarter century is in sight!. Michael was highly impressed with his Birthday present of your painted beets!

Edited by leslie10646
  • Like 4
  • Informative 1
Posted

With 15 spoils and 17 Double beets built and painted plus Darius` efforts and Leslie noting sales figures it must be pretty likely that the good boys will add to the rtr Irish wagon market before three long.  Everything crossed for 80 class and Jeeps after Hunslet  101s  once the latest BR models get over finishing line at IRM towers/ Accurascale bunker.   A thanks to Leslie for priming the market and Darius getting salesman of the year award! 

Robert   

  • Funny 3
Posted
15 hours ago, leslie10646 said:

Great stuff, Darius.

Now what are you going to load them with? Does anyone do "4mm Genuine Maghermorne rock"?

Someone needs to get up to Magheramorne with a bag and a hammer, or, failing that, dig some out of the M2 embankment…

Cheers

Darius

  • Funny 1
Posted
5 minutes ago, Darius43 said:

Someone needs to get up to Magheramorne with a bag and a hammer, or, failing that, dig some out of the M2 embankment…

Cheers

Darius

Re M2 - we could get one of these "Stop Oil" loonies to dig up a bit of the embankment during a protest.

 

  • Funny 3
Posted
17 minutes ago, Darius43 said:

Made a start on the remaining three coaches for the “Bombay Local” EMU set that I started in 2016.

IMG_8568.thumb.jpeg.ee421cb7b4fe7869d202c2632556d7b4.jpeg

IMG_8569.thumb.jpeg.d8a4346990de0663331a83507b5cf338.jpeg

The coach bodies are made from plasticard and fixed to a modified Triang Mk1 coach chassis.

2016 Bombay Local construction thread here

Cheers

Darius

This remains one of my favourite railway documentaries - the level of determination to 'make it work' is astonishing.

 

Good luck with intricacy that the water features at the start would require on a layout...

  • Like 2
Posted
1 hour ago, Darius43 said:

Driving coach bodyshell assembled - apart from the cab end.

IMG_8575.jpeg.8e9de2ff1b43be672677173f3a6ef6a8.jpeg

IMG_8576.jpeg.294ffe6a56c3687a362f66fa161080c8.jpeg

IMG_8577.jpeg.0f613ee560113f512278cbe575edad73.jpeg

IMG_8578.jpeg.998b255341112ea64d0e16c0db797932.jpeg

IMG_8579.jpeg.5076f46774e292b27a4b304f25c01ea2.jpeg

IMG_8580.jpeg.35b478f178512077a34b336c652c0d20.jpeg

Cheers

Darius

WOWWWWWW!!!!!!  Amazing stuff! Indian railways are VERY under-represented in the model world. Any chance of a YP Pacific or YG 8-wheeler? (Or a YL?)

  • Like 1
Posted

Main painting completed.

IMG_8606.jpeg.524c4a23baa775fd6f4422f0f5dbc4f5.jpeg

IMG_8607.jpeg.a3acd8e6b41db20269b9c7964a9835b4.jpeg

IMG_8608.jpeg.364c2f760774dd35bffbc7e6ddda0092.jpeg

IMG_8609.jpeg.484617dea3916964d0db294437a2a344.jpeg

The roof is just placed loosely in the photos.  The original Triang coach roof is sandwiched inside and the Triang roof bolts are used to hold it down in service.

Cheers

Darius

  • Like 5
  • WOW! 1
Posted (edited)

Buffers and other details added to the cab end - plus bogies.

IMG_8621.jpeg.7261fe6c57c1cb599a7faed588e8a4c4.jpeg

IMG_8622.jpeg.27a98601a58e9b5d7bd6b0c30dcc1621.jpeg

IMG_8623.jpeg.988a3df23fca1095a10bd3459e3c71b9.jpeg

IMG_8625.jpeg.ecf1d69a10e885e76ba2fd2a91f4dde7.jpeg

IMG_8627.thumb.jpeg.ca95809baad93270d8d18ea6974b32c8.jpeg

Almost finished apart from the mesh grilles over the windows.  Awaiting suitable mesh from the Bay of e.

Cheers

Darius

Edited by Darius43
  • Like 6
Posted

Started work on a composite coach this evening.  

Sides marked out on a sheet of plasticard.

IMG_8639.jpeg.20326c2db99fed0026b3f0bf08778a05.jpeg

Windows cut out.

IMG_8640.jpeg.d2909fa3db945191e9a39f46dc765599.jpeg

Doors cut out.

IMG_8641.jpeg.4e555b75c3f34318e595114bb897b1c7.jpeg

Representations of the sliding doors and window shutters glued to the inside face of the carriage sides.  These are always open.

IMG_8642.jpeg.5d9786b9db11a65a7af8a79ad9340262.jpeg

Coach ends made using a plasticard master template.

IMG_8643.jpeg.2f8acc4cf3d8032a80c05571dd7a2fd9.jpeg

Vestibule walls made from 1mm thick plasticard.  These have the curved profile of the carriage sides on one edge and will be glued in place once the carriage sides have been fixed to the chassis.

IMG_8644.jpeg.d40c2834add59c1f90c010601d504736.jpeg

Carriage sides fixed in place.

IMG_8645.jpeg.f8fe4b2911fdee4574b8076f1e75c38e.jpeg

IMG_8646.jpeg.2b57b3cba314d9ce9aa04a0a997f631a.jpeg

Cheers

Darius

  • Like 6
Posted

Roof constructed using plasticard and the original Triang coach roof - with the molded on roof details removed.

IMG_8660.jpeg.5c3da8b5f4d6dc3a2218a548f06a2aa1.jpeg

IMG_8661.jpeg.419f6af843b8de063ab61d53c7e4ac67.jpeg

The edge of the roof base is superglued to a sheet of 0.5mm thick plasticard.

IMG_8662.jpeg.b6e5a09aad7622560fd5afb416589ae5.jpeg

Once this glued joint has cured, the roof is rolled round to the half way point and superglued in place, then rolled around again to glue the other side.

IMG_8663.jpeg.66413dde62fe33142eff0d77ca7a7a9c.jpeg

After all the glued joints have cured the excess plasticard is trimmed away and the edges cleaned up.

IMG_8664.jpeg.f147a82ae80bf64662eb71507562ad93.jpeg

IMG_8665.jpeg.7b5a686ce2cc79c4644faf1a7427a52b.jpeg

IMG_8666.jpeg.8e76d2185ff303aa92c107e26f778464.jpeg

IMG_8667.jpeg.5e8d63eda9985ed79a0a2f3513e52f5c.jpeg

Cheers

Darius

  • Like 4
  • WOW! 1

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use