warb Posted August 9, 2018 Author Posted August 9, 2018 Went back to baseboards to start again to re arrange barrow street end Photo1 and updated photos of same with a delivery some of the evergreen strip for google buildings alone. 7 1 Quote
RobertRoche Posted August 9, 2018 Posted August 9, 2018 Some very atmospheric shots there,, especially with the lone van in the yard. That is a lot of plasticard. Quote
Mayner Posted August 9, 2018 Posted August 9, 2018 48 minutes ago, RobertRoche said: Some very atmospheric shots there,, especially with the lone van in the yard. That is a lot of plasticard. Is the part burnt out van still at the end of the siding in the Boston Yard? Quote
warb Posted August 9, 2018 Author Posted August 9, 2018 Long removed john had been there for years 7 1 Quote
David Holman Posted August 10, 2018 Posted August 10, 2018 (edited) Remarkable. The vision required to create this scene, let alone the enthusiasm to build it, is fantastic. We can only hope it will get public outings so we can all enjoy it. Looks like about £100 worth over Evergreen strip there. Still not bad when you think how much it would cost to commission such a building, but start up costs seem to be growing exponentially these days. For example, I must have close to 100 Humbrol tinlets. Replacing them with Tamiya acrylics would be quite an expense were I to do it all at once. There again, how many colours do you really need? Three, five? As for plastic sheet, a full sized A1 piece from Eileen's will set you back the same as an A4 from your local model shop. Hence a very good reason to plan your shopping if visiting a show and with no Maplins on the High Street anymore, the same goes for electrical bits too. Enough already! Barrow Street is sublime. Edited August 10, 2018 by David Holman 1 Quote
warb Posted August 12, 2018 Author Posted August 12, 2018 re arranged barrow street end full weekend of works where does it go 6 2 Quote
GNRi1959 Posted August 13, 2018 Posted August 13, 2018 Noel, this is unreal. Next time I'm in Dublin I need to check out this area and see it for myself. Quote
warb Posted August 17, 2018 Author Posted August 17, 2018 Small update new footpaths fitted to barrow street and front plinth varnished 5 Quote
jhb171achill Posted August 17, 2018 Posted August 17, 2018 This just keeps getting supernaturally better! Such an unusual prototype with so much detailed thought going into its planning, never mind its execution. I'm really enjoying seeing this one develop. I take it you live in a 5-storey house to accommodate it!!! Quote
warb Posted August 21, 2018 Author Posted August 21, 2018 small improvements to barrow street 8 Quote
warb Posted September 5, 2018 Author Posted September 5, 2018 minor works completed including backscene and front pelmet raised due to google buildings and template made for bridge access between buildings 7 3 Quote
RedRich Posted September 5, 2018 Posted September 5, 2018 This layout belongs in the epic category. You don't see many urban scenes like this. I always thought Nigel Burkins Platform 4a and 4b (although smaller than Barrow street) was a great piece of modern urban modelling and this is right up there with it. Rich, Quote
warb Posted September 6, 2018 Author Posted September 6, 2018 stock boxes completed for barrow street 3 Quote
Robert Shrives Posted September 6, 2018 Posted September 6, 2018 Good looking trays, will you line with acid free tissue paper and have card slips between coaches ? or foam buffer protectors, I have done all three - albeit in G1 , I use JB foam in N gauge which with a card base is very good. Just to add to all an opus project of great standing and brilliant executed. A case of the 5Ps at work Quote
warb Posted September 6, 2018 Author Posted September 6, 2018 i will use both foam stops and card slips when i get around to it regards Quote
David Holman Posted September 9, 2018 Posted September 9, 2018 So, when and where can we hope to see this opus? Quote
warb Posted September 9, 2018 Author Posted September 9, 2018 Still to much work to do. Hopefully a year or 2 to go only back working on google building which i have not worked on for a while thanks 4 Quote
GNRi1959 Posted September 10, 2018 Posted September 10, 2018 (edited) Warb, I take some interest in your storage boxes and methods - very similar to the way I think. I suppose all good carpenters think alike. I can appreciate your skill. Edited September 11, 2018 by GNRi1959 Quote
warb Posted September 11, 2018 Author Posted September 11, 2018 Sixth floor being installed to google buildings 6 2 Quote
David Holman Posted September 11, 2018 Posted September 11, 2018 Only the sixth floor?! Thank goodness I only have room for three! Splendid, as ever. Quote
warb Posted September 15, 2018 Author Posted September 15, 2018 safety rails made and painted 7 Quote
warb Posted September 17, 2018 Author Posted September 17, 2018 Batch building remaining 90 ceiling girders and safety rails installed 4 2 Quote
warb Posted September 23, 2018 Author Posted September 23, 2018 While waiting for more styrene strips irish rail class 790 is started and appeared on barrow street 8 2 Quote
warb Posted September 24, 2018 Author Posted September 24, 2018 where would we be without evergreen strip and plastikard 5 Quote
David Holman Posted September 25, 2018 Posted September 25, 2018 Not just a maker of fine buildings then. Not surprised! Evergreen strip has got very expensive of late - about 50p per piece/£5.00 a pack. Potentially cheaper to buy laser cut windows than make them yourself in 7mm scale. Trouble is, you can't always get what you want, as Sir Michael once sang. Quote
warb Posted September 27, 2018 Author Posted September 27, 2018 next batch of styrene requiring work for barrow street 1 Quote
warb Posted October 14, 2018 Author Posted October 14, 2018 latest update photos for barrow street 6 1 Quote
David Holman Posted October 15, 2018 Posted October 15, 2018 What an extraordinary edifice that is. Must be one of the larger/est 4mm scale buildings made in recent times. And the ideal view blocker at the end of a scenic section too 1 Quote
warb Posted October 15, 2018 Author Posted October 15, 2018 Grand canal dock station footbridge near completion with fine mesh fitted to over bridge 7 4 Quote
warb Posted November 2, 2018 Author Posted November 2, 2018 Last floor being added and rear wall with lights wiring to each floor. 5 1 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.