I dont think they were compatable .The train was coupled together except for the electrical systems they were two seperate systems . A similer thing would happen with a eight piece plus Mk2D sets were used two EGVs would be used , also when more than eight cravens were used in a set two GSV's would be used one at each end an the electrical systemd split in the centre .