Rachelstown and St Stephens Green

Rate this topic


Recommended Posts

Posted (edited)

Many thanks for looking into the thread and making comments on the progress and advice. I'm seeking direction of how to position signals, their correct aspects, etc if any of you are willing to advise it would be very much appreciated, please feel free to give any contributions you feel constructive. The signals are colour light ype TDR

Edited by The Derry Road
  • 4 weeks later...
Posted

Current update

 

Hi everyone, it’s been a long three weeks with lots of running trains to make sure all track/points are ok.:trains: All missing sleepers were replaced last night into the spaces were track was joined together. Platforms and roads have received first coat of primer to tone all bits similar colour.:dig:

I have now received all the ballast required for the whole layout, it is a mix of 2/3 woodland scenic medium grey blend and 1/3 Gaugemaster grey in medium size. The first application will be applied dry this evening. I’ve watched the “shows you how to series” produced by the guy whom build Everard Junction on you tube and his methods and instructions are first class so I’ll be following his technique. Pictures to follow shortly. TDR:-bd

Posted

Some pictures of the ballast around the station area, I've purposely left the point blades clear for now as the instruction shows a different method of application hopefully get them done over this weekend, TDR

 

sbsxmg.jpgzkswh5.jpg280sadf.jpg

 

k01pic.jpg21ju9w7.jpg2z6y2pl.jpg

 

34sjji9.jpgs186cz.jpg

 

Many thanks for looking in TDR

Posted (edited)

Ballasting is still ongoing down at Rachelstown with the PW crew putting finishing touches to the track.

 

 

1r3jmg.jpg21b9m61.jpg

2vvmdmd.jpg

 

The PW crew will move tonight to St Stephens Green where Ballasting will continue

 

2805qok.jpg

 

A well earned rest will be taken when this is complete, ballasting is so boring yet necessary TDR

Edited by Garfield
Posted

Superb work TDR,the ballasting is very neat and really lifts the layout to a whole new level.Really like the large style country houses,they really capture the look of rural Ulster,a complete contrast to my own layout,although the St Stephens Green section looks like it will develop into an interesting section and a nice contrast to the more rural scene.A really nice balance and atmosphere to the layout,well done,its a credit to you.

Posted
Great work going on there TDR, an inspiration to all, very well done, keep it up, & the pics, mind telling me what your baseboard is made of,

 

BTB the boards are 15mm plywod strengthened by 2/1 under. The St Stephens Green is same plywood strengthen on 25mm plywood as drawers will be fitted under shortly. TDR

Posted (edited)

Hi Folks

Update on St Stephens Green side of the layout showing stages of ballasting before during and after applications. Also showing the positions of some of the plant areas at their current state Enjoy

 

34gov0p.jpg9860pt.jpg30cwwmp.jpg

 

33pd9qt.jpg2wq75ua.jpg1exbbn.jpg

 

2ujl6xv.jpg2zfvbkg.jpg2uzqamx.jpg

 

5uqzol.jpgok5tgg.jpge6ucg8.jpg

 

33x8qy8.jpgvytwdz.jpg

 

A well deserved running secession for a week or two now, then a full implimention of colour light signalling starts TDR

Edited by The Derry Road
Posted

Love your Cement Tanks area and I see you got the 'Control Tower' worked in, well done. The ballasting really 'grounds' the layout if you know what I mean and you well deserve a bit of train running time after that tedious job.

Posted
TDR, for ****'s sake will you slow down, you'er showing us all up, me especially, what a lot of work you have done there, well done sir,

 

BTB, I will be slowing down now considerably when the ballasting has had final touches, A good running session is now planned for the next week or two. I will then start work on an accurate Colour light signalling programme consisting of 31 signals as designed for me to suit the layout by another member of this forum. This will take considerable amount of time to construct/complete, however I will also be detailing the remainder of the layout as bits and pieces and time become available. watch this space.TDR

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use