Jump to content

Orange Is The New Black - Iconic Mark 2B and 2C Coaches Announced

Rate this topic


Warbonnet

Recommended Posts

25 minutes ago, Georgeconna said:

Went for the Black roof ones myself.

Had the whole lot of coach options selected and the total price 6 month payout was a sobering 180 per month so cut back a tad. Have to eat too!!

When I started the Irish stuff it was just a 141 and a couple of cravens running around a Country Terminus I had in Mind. 

 

The slippery slope is now a near vertical ski jump..  but just sit back and enjoy the ride.  The Country Terminus can now enjoy a Friday only extra from Dublin. 

Robert 

  • Like 2
Link to comment
Share on other sites

1 hour ago, murphaph said:

Maybe Phase 1 & 2? (SO is just standard open I guess)

I'd be interested to know the correct answer too.

Interesting question alright: if it is phase 1 and 2 perhaps that refers to the batch they were manufactured in originally in the UK? Just speculating because the Ph.1 have higher running numbers ...

Link to comment
Share on other sites

12 minutes ago, flange lubricator said:

In the Description on your site 

Mk.2c Ph2 SO (ex-FO) 4103 Black Roof
Mk.2c Ph2 SO (ex-FO) 4104 Black Roof
Mk.2c Ph2 SO (ex-FO) 4105 Black Roof
Mk.2b Buffet (ex-FK) 4402 Orange Roof

 

Aha!

There are two "phases" of Mk.2c coach, those with large GM roof vents and large toilet window (phase 1) and with Roe-Vac roof vents and smaller "air con" style toilet windows with no vent (phase 2). IR had mostly Phase 2 with a single Phase 1 vehicle. 

So in this case its the original build phase of the coaches nothing to do with us :)

The NIR coaches are due relatively soon, and these IE packs are in the next batch

Link to comment
Share on other sites

11 hours ago, BosKonay said:

 

Aha!

There are two "phases" of Mk.2c coach, those with large GM roof vents and large toilet window (phase 1) and with Roe-Vac roof vents and smaller "air con" style toilet windows with no vent (phase 2). IR had mostly Phase 2 with a single Phase 1 vehicle. 

So in this case its the original build phase of the coaches nothing to do with us :)

The NIR coaches are due relatively soon, and these IE packs are in the next batch

THanks!

 

Link to comment
Share on other sites

  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use